Оцінка надійності тиристорного модулю високовольтних гібридних комутаційних апаратів в умовах резервування

In the article, the authors proposed a methodology for evaluating the main indicators of the operational reliability of a high-voltage thyristor module, which is an element of electric power equipment, using the example of the design of such electrical devices as hybrid switches and converters in the structure of traction substations, power supply systems of metallurgical complexes, etc. The proposed method makes it possible to estimate the prob-ability of failure-free operation of the real design of the thyristor module, taking into account its design and implementation scheme, as well as the level and depth of redundancy of the semiconductor devices included in it. As initial data, the proposed method involves the use of electrical load parameters in terms of voltage and current and their redistribution as the reserve resource is exhausted, taking into account the design features of both the electrical device itself and the power supply network where it is located. is established. The proposed method makes it possible to evaluate the effectiveness of the influence of design factors (the number of semiconductor devices, the principle and depth of redundancy, the economic component, etc.) on the main indicators of the operational reliability of the corresponding types of high-voltage equipment, taking into account the electrical load and its changes. The proposed method was tested on the example of a real scheme of the thyristor module of the on-load tap-changer switching device, which was in industrial operation for a long time in the most unfavourable conditions in the power supply structure of the metallurgical industry, where there is high switching frequency, load fluctuations, etc. The implementation of this technique in the conditions of designing high-voltage switching and converting electrical equipment, as well as its operation in the power supply structure, allows to evaluate the influence of the structural features of the semiconductor part, taking into account the load mode, as well as the influence of external and operational factors. A more accurate determination of the effectiveness of the proposed methodology for predicting operational reliability indicators depending on the mode and depth of the load and the type of backup system can be achieved by conducting an additional series of experimental tests on the choice of the type of theoretical system. distribution law and determination of its parameters for specific designs of electrical devices. Thus, a conclusion was made about the possibility of using the obtained results to evaluate the parameters of the operational reliability of the above-mentioned high-voltage equipment, which is used as part of switchgear and power supply systems in both high and low voltage conditions.

Publication Details

Journal
The Scientific Issues of Ternopil Volodymyr Hnatiuk National Pedagogical University Series pedagogy
Published
2024-12-26
Primary Topic
Power System Reliability and Maintenance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Оцінка надійності тиристорного модулю високовольтних гібридних комутаційних апаратів в умовах резервування

The Scientific Issues of Ternopil Volodymyr Hnatiuk National Pedagogical University Series pedagogy
Power System Reliability and Maintenance
article

Оцінка надійності тиристорного модулю високовольтних гібридних комутаційних апаратів в умовах резервування

article en

Abstract

In the article, the authors proposed a methodology for evaluating the main indicators of the operational reliability of a high-voltage thyristor module, which is an element of electric power equipment, using the example of the design of such electrical devices as hybrid switches and converters in the structure of traction substations, power supply systems of metallurgical complexes, etc. The proposed method makes it possible to estimate the prob-ability of failure-free operation of the real design of the thyristor module, taking into account its design and implementation scheme, as well as the level and depth of redundancy of the semiconductor devices included in it. As initial data, the proposed method involves the use of electrical load parameters in terms of voltage and current and their redistribution as the reserve resource is exhausted, taking into account the design features of both the electrical device itself and the power supply network where it is located. is established. The proposed method makes it possible to evaluate the effectiveness of the influence of design factors (the number of semiconductor devices, the principle and depth of redundancy, the economic component, etc.) on the main indicators of the operational reliability of the corresponding types of high-voltage equipment, taking into account the electrical load and its changes. The proposed method was tested on the example of a real scheme of the thyristor module of the on-load tap-changer switching device, which was in industrial operation for a long time in the most unfavourable conditions in the power supply structure of the metallurgical industry, where there is high switching frequency, load fluctuations, etc. The implementation of this technique in the conditions of designing high-voltage switching and converting electrical equipment, as well as its operation in the power supply structure, allows to evaluate the influence of the structural features of the semiconductor part, taking into account the load mode, as well as the influence of external and operational factors. A more accurate determination of the effectiveness of the proposed methodology for predicting operational reliability indicators depending on the mode and depth of the load and the type of backup system can be achieved by conducting an additional series of experimental tests on the choice of the type of theoretical system. distribution law and determination of its parameters for specific designs of electrical devices. Thus, a conclusion was made about the possibility of using the obtained results to evaluate the parameters of the operational reliability of the above-mentioned high-voltage equipment, which is used as part of switchgear and power supply systems in both high and low voltage conditions.

The Scientific Issues of Ternopil Volodymyr Hnatiuk National Pedagogical University Series pedagogy
Openalex Percentile: Top 51%
Power System Reliability and Maintenance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.