Diagrama de Ishikawa y las 3 Mu como herramientas para el diagnóstico de la productividad

The purpose of this paper is to identify the factors that affect the productivity of a plastics company in Mexico, answering the question: What are the factors that decrease the productivity of the review and adjustment area in a plastics company? To achieve this, a case study methodology was used, supported by the collection of quantitative and qualitative data based on interviews, observations, document review and company statistics. It was found that the problems causing low productivity in the company are found within six factors: material, labor, method, environment, measurement, machinery, and equipment. The main limitation is that it is research focused on a single company, but at the same time this gives greater value to the investigation by contributing knowledge regarding the usefulness offered by the combination of the 3 Mu tools and the Ishikawa diagram, used to make a productivity diagnosis. It is concluded that the research represents an important contribution on the use of industrial engineering tools to study productivity, thanks to its systematic approach, rigorous analysis, and detailed diagnosis.

Publication Details

Journal
Dialnet (Universidad de la Rioja)
Published
2025-01-01
Primary Topic
Business, Education, Mathematics Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Diagrama de Ishikawa y las 3 Mu como herramientas para el diagnóstico de la productividad

Dialnet (Universidad de la Rioja)
Business, Education, Mathematics Research
article

Diagrama de Ishikawa y las 3 Mu como herramientas para el diagnóstico de la productividad

article en

Abstract

The purpose of this paper is to identify the factors that affect the productivity of a plastics company in Mexico, answering the question: What are the factors that decrease the productivity of the review and adjustment area in a plastics company? To achieve this, a case study methodology was used, supported by the collection of quantitative and qualitative data based on interviews, observations, document review and company statistics. It was found that the problems causing low productivity in the company are found within six factors: material, labor, method, environment, measurement, machinery, and equipment. The main limitation is that it is research focused on a single company, but at the same time this gives greater value to the investigation by contributing knowledge regarding the usefulness offered by the combination of the 3 Mu tools and the Ishikawa diagram, used to make a productivity diagnosis. It is concluded that the research represents an important contribution on the use of industrial engineering tools to study productivity, thanks to its systematic approach, rigorous analysis, and detailed diagnosis.

Dialnet (Universidad de la Rioja)
Decent work and economic growth
Openalex Percentile: Top 36%
Business, Education, Mathematics Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Diagrama de Ishikawa y las 3 Mu como herramientas para el diagnóstico de la productividad · Dialnet (Universidad de la Rioja) (2025) | TGRS Research Map | TGRS