From Bottlenecks to Efficiency : Investigating Barriers to Increase Production Capacity at Hitachi Energy

This thesis investigated how the cylinder production at Hitachi Energy Öjebyn could be improved to meet a projected 60% increase in demand by autumn 2025. The study focused on identifying inefficiencies in the current production flow, with the goal of increasing the output from 25 to 40 cylinders per day. The study was conducted as a case study using the DMAIC methodology. Data was collected through Gemba walks, interviews, ERP data analysis, and manual time measurements. Both qualitative and quantitative data were used. In the Define phase, problems such as reactive planning, lack of coordination between departments, and unclear responsibilities were identified. In the Measure phase, data was collected to analyze delivery history using ABC-classification and to map bottlenecks using value stream mapping. The analysis showed large variations in lead times, low value-added time, uneven shift structures, and high scrap rates, especially for non-varnished products. The inspection station and one of the hardening ovens were identified as physical bottlenecks, as well as the NC station, if not planned consciously. Improvement proposals were developed to increase output. Inventory for three levels: semi-semi-finished shafts, semi-finished products, and finished products, was proposed based on adjusted demand, service levels, and lead times. The fixture storage at the NC station was proposed to be organized using 5S to reduce setup times. A unified four-shift model was suggested for several stations to balance the flow. A second inspection station was recommended to reduce queues. Visual control and daily improvement meetings were proposed to support operator involvement in continuous improvement efforts. In the Control phase, an action plan was developed for each improvement proposal, including assigned responsibilities, KPIs, and milestones. Examples of KPIs include scrap rate, lead time, and inventory turnover. In summary, the study shows that both organizational and physical constraints affect capacity. By improving planning, inventory management, and work routines, production can become more stable and scalable.

Publication Details

Journal
KTH Publication Database DiVA (KTH Royal Institute of Technology)
Published
2025-01-01
Primary Topic
Operations Management Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

From Bottlenecks to Efficiency : Investigating Barriers to Increase Production Capacity at Hitachi Energy

KTH Publication Database DiVA (KTH Royal Institute of Technology)
Operations Management Techniques
article

From Bottlenecks to Efficiency : Investigating Barriers to Increase Production Capacity at Hitachi Energy

article en

Abstract

This thesis investigated how the cylinder production at Hitachi Energy Öjebyn could be improved to meet a projected 60% increase in demand by autumn 2025. The study focused on identifying inefficiencies in the current production flow, with the goal of increasing the output from 25 to 40 cylinders per day. The study was conducted as a case study using the DMAIC methodology. Data was collected through Gemba walks, interviews, ERP data analysis, and manual time measurements. Both qualitative and quantitative data were used. In the Define phase, problems such as reactive planning, lack of coordination between departments, and unclear responsibilities were identified. In the Measure phase, data was collected to analyze delivery history using ABC-classification and to map bottlenecks using value stream mapping. The analysis showed large variations in lead times, low value-added time, uneven shift structures, and high scrap rates, especially for non-varnished products. The inspection station and one of the hardening ovens were identified as physical bottlenecks, as well as the NC station, if not planned consciously. Improvement proposals were developed to increase output. Inventory for three levels: semi-semi-finished shafts, semi-finished products, and finished products, was proposed based on adjusted demand, service levels, and lead times. The fixture storage at the NC station was proposed to be organized using 5S to reduce setup times. A unified four-shift model was suggested for several stations to balance the flow. A second inspection station was recommended to reduce queues. Visual control and daily improvement meetings were proposed to support operator involvement in continuous improvement efforts. In the Control phase, an action plan was developed for each improvement proposal, including assigned responsibilities, KPIs, and milestones. Examples of KPIs include scrap rate, lead time, and inventory turnover. In summary, the study shows that both organizational and physical constraints affect capacity. By improving planning, inventory management, and work routines, production can become more stable and scalable.

KTH Publication Database DiVA (KTH Royal Institute of Technology)
Affordable and clean energy
Openalex Percentile: Top 41%
Operations Management Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

From Bottlenecks to Efficiency : Investigating Barriers to Increase Production Capacity at Hitachi Energy · KTH Publication Database DiVA (KTH Royal Institute of Technology) (2025) | TGRS Research Map | TGRS