Key challenges in the pre-contract for building information modelling (BIM) project

The Malaysian construction industry is undergoing digital transformation through the Construction 4.0 Strategic Plan (2021-2025), with Building Information Modelling (BIM) playing a key role in enhancing project efficiency. BIM is a technology that enables the creation, communication, and analysis of digital models through a construction project’s lifecycle. The pre-construction stage, which includes design, cost estimation, cost planning, and tender preparation, is critical to project success but often encounters data interoperability issues and communication breakdowns, leading to delays and cost overruns. Despite BIM’s potential to improve collaboration, streamline processes, and enhance decision-making, its application remains limited due to reliance on traditional methods. Therefore, this research aims to examine BIM application during the pre-construction stage, identify key challenges, and propose strategies for its effective implementation. A mixed-method approach was employed, utilizing questionnaire surveys and interviews for data collection. The findings reveal that the high implementation cost is a significant barrier, limiting its widespread implementation. By addressing these issues, the Malaysian construction industry can accelerate its digital transformation, improving efficiency, collaboration, and competitiveness.

Publication Details

Journal
The International Islamic University Malaysia Repository (The International Islamic University Malaysia)
Published
2025-06-12
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Key challenges in the pre-contract for building information modelling (BIM) project

The International Islamic University Malaysia Repository (The International Islamic University Malaysia)
BIM and Construction Integration
article

Key challenges in the pre-contract for building information modelling (BIM) project

article en

Abstract

The Malaysian construction industry is undergoing digital transformation through the Construction 4.0 Strategic Plan (2021-2025), with Building Information Modelling (BIM) playing a key role in enhancing project efficiency. BIM is a technology that enables the creation, communication, and analysis of digital models through a construction project’s lifecycle. The pre-construction stage, which includes design, cost estimation, cost planning, and tender preparation, is critical to project success but often encounters data interoperability issues and communication breakdowns, leading to delays and cost overruns. Despite BIM’s potential to improve collaboration, streamline processes, and enhance decision-making, its application remains limited due to reliance on traditional methods. Therefore, this research aims to examine BIM application during the pre-construction stage, identify key challenges, and propose strategies for its effective implementation. A mixed-method approach was employed, utilizing questionnaire surveys and interviews for data collection. The findings reveal that the high implementation cost is a significant barrier, limiting its widespread implementation. By addressing these issues, the Malaysian construction industry can accelerate its digital transformation, improving efficiency, collaboration, and competitiveness.

The International Islamic University Malaysia Repository (The International Islamic University Malaysia)
Industry, innovation and infrastructure
Openalex Percentile: Top 50%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.