Aggregated volume/time planning models for one class of discrete production systems

We consider an operational scheduling problem for one class of discrete production systems. The volumetric characteristics of the schedule must be optimal according to the criterion that includes aggregated time constraints. We propose to solve this problem in two stages. The first one is finding an aggregated plan that corresponds to one of the original aggregated volume/time models proposed by the authors. The second stage is the disaggregation of the obtained optimal aggregated plan (that includes aggregated time constraints) converting it into an operational schedule. The implementation of the second stage is not considered in this paper. We have proposed a number of linear models which differ both in the number of constraints and variables and in the methods of their solution, as linear programming problems. The proposed models are generalized in the case of the need to find a compromise solution with respect to a set of possibly antagonistic linear criteria in a deterministic formulation and in uncertainty conditions. Ref. 17.

Publication Details

Journal
The Scientific Issues of Ternopil Volodymyr Hnatiuk National Pedagogical University Series pedagogy
Published
2024-10-15
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Aggregated volume/time planning models for one class of discrete production systems

The Scientific Issues of Ternopil Volodymyr Hnatiuk National Pedagogical University Series pedagogy
Resource-Constrained Project Scheduling
article

Aggregated volume/time planning models for one class of discrete production systems

article en

Abstract

We consider an operational scheduling problem for one class of discrete production systems. The volumetric characteristics of the schedule must be optimal according to the criterion that includes aggregated time constraints. We propose to solve this problem in two stages. The first one is finding an aggregated plan that corresponds to one of the original aggregated volume/time models proposed by the authors. The second stage is the disaggregation of the obtained optimal aggregated plan (that includes aggregated time constraints) converting it into an operational schedule. The implementation of the second stage is not considered in this paper. We have proposed a number of linear models which differ both in the number of constraints and variables and in the methods of their solution, as linear programming problems. The proposed models are generalized in the case of the need to find a compromise solution with respect to a set of possibly antagonistic linear criteria in a deterministic formulation and in uncertainty conditions. Ref. 17.

The Scientific Issues of Ternopil Volodymyr Hnatiuk National Pedagogical University Series pedagogy
Openalex Percentile: Top 43%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.