Post-contract cost control for building construction projects

Cost control is implemented to manage the cost of construction projects. Cost control is important in both pre-contract and post-contract stages, but it is more vital in the latter stage. It is a continuous process and must be conducted throughout the project to ensure the final construction cost does not exceed the estimated cost, thus preventing cost overrun. Various factors may lead to cost overrun, especially in building construction projects. Inadequate cost management is not a matter to be taken lightly because it results in a large number of cost overruns. This alarming problem is negatively affecting the parties involved in the project and the nation. Hence, this study is carried out to mitigate cost overrun by practicing effective cost control. This research is conducted to identify the post-contract cost control practices implemented by contractors for building construction projects, the challenges encountered, and the strategies to overcome the challenges. The method utilized is the quantitative method, which involves conducting a questionnaire survey. 28 respondents from G6 and G7 contractors have provided feedback, and the results obtained were analyzed using Statistical Social Package Science (SPSS). For the first objective, the post-contract cost control practices for building construction projects include monitoring material costs, using bills of quantities to manage construction costs, and monitoring overheads. For the second objective, the challenges encountered include poor project planning, poor communication between project parties, and improper contract documentation. For the last objective, the strategies to overcome the challenges include good construction planning, effective site supervision, and appointment of qualified management staff. This research serves as an exploration of the improvements in the practices of post-contract cost control in construction projects.

Publication Details

Journal
The International Islamic University Malaysia Repository (The International Islamic University Malaysia)
Published
2024-12-11
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Post-contract cost control for building construction projects

The International Islamic University Malaysia Repository (The International Islamic University Malaysia)
Construction Project Management and Performance
article

Post-contract cost control for building construction projects

article en

Abstract

Cost control is implemented to manage the cost of construction projects. Cost control is important in both pre-contract and post-contract stages, but it is more vital in the latter stage. It is a continuous process and must be conducted throughout the project to ensure the final construction cost does not exceed the estimated cost, thus preventing cost overrun. Various factors may lead to cost overrun, especially in building construction projects. Inadequate cost management is not a matter to be taken lightly because it results in a large number of cost overruns. This alarming problem is negatively affecting the parties involved in the project and the nation. Hence, this study is carried out to mitigate cost overrun by practicing effective cost control. This research is conducted to identify the post-contract cost control practices implemented by contractors for building construction projects, the challenges encountered, and the strategies to overcome the challenges. The method utilized is the quantitative method, which involves conducting a questionnaire survey. 28 respondents from G6 and G7 contractors have provided feedback, and the results obtained were analyzed using Statistical Social Package Science (SPSS). For the first objective, the post-contract cost control practices for building construction projects include monitoring material costs, using bills of quantities to manage construction costs, and monitoring overheads. For the second objective, the challenges encountered include poor project planning, poor communication between project parties, and improper contract documentation. For the last objective, the strategies to overcome the challenges include good construction planning, effective site supervision, and appointment of qualified management staff. This research serves as an exploration of the improvements in the practices of post-contract cost control in construction projects.

The International Islamic University Malaysia Repository (The International Islamic University Malaysia)
No poverty
Openalex Percentile: Top 43%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.