Joint Flood Control Operation of Reservoirs in Xiaoshui Basin Based on DP-PS Algorithm

Taking the reservoir group in the Xiaoshui Basin as the research object, this paper builds a model of joint flood control operation of the reservoir group in the Xiaoshui Basin under combined floods from main and tributary rivers of different frequencies. On this basis, the dynamic programming-pattern search algorithm (DP-PS) is introduced to solve the model, and the operation scheme under the most unfavorable flood scenario is obtained. The results show that, under combined floods of various scenarios, the maximum peak clipping rate of Centianhe Reservoir is above 70%, and that of the Shuangpai Reservoir is above 28%. After the optimized operation of the Centianhe Reservoir, the flood control risk rate of Jianghua County is zero (except for flood No. 7), and the flood control risk rate of Dao County is below 18%. After the optimized operation of Shuangpai Reservoir, the risk rate of flood control in Shuangpai County is below 22% (except for flood No. 7), and the risk rate of flood control in Lingling district is below 34%. In conclusion, after the optimized operation of joint flood control of reservoirs in Xiaoshui Basin, remarkable flood control effects can be seen in Jianghua County, Dao County, Shuangpai County, and Lingling District.

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2024-10-01
Primary Topic
Urban and spatial planning
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Joint Flood Control Operation of Reservoirs in Xiaoshui Basin Based on DP-PS Algorithm

SHILAP Revista de lepidopterología
Urban and spatial planning
article

Joint Flood Control Operation of Reservoirs in Xiaoshui Basin Based on DP-PS Algorithm

article en

Abstract

Taking the reservoir group in the Xiaoshui Basin as the research object, this paper builds a model of joint flood control operation of the reservoir group in the Xiaoshui Basin under combined floods from main and tributary rivers of different frequencies. On this basis, the dynamic programming-pattern search algorithm (DP-PS) is introduced to solve the model, and the operation scheme under the most unfavorable flood scenario is obtained. The results show that, under combined floods of various scenarios, the maximum peak clipping rate of Centianhe Reservoir is above 70%, and that of the Shuangpai Reservoir is above 28%. After the optimized operation of the Centianhe Reservoir, the flood control risk rate of Jianghua County is zero (except for flood No. 7), and the flood control risk rate of Dao County is below 18%. After the optimized operation of Shuangpai Reservoir, the risk rate of flood control in Shuangpai County is below 22% (except for flood No. 7), and the risk rate of flood control in Lingling district is below 34%. In conclusion, after the optimized operation of joint flood control of reservoirs in Xiaoshui Basin, remarkable flood control effects can be seen in Jianghua County, Dao County, Shuangpai County, and Lingling District.

SHILAP Revista de lepidopterología
Sustainable cities and communities
Openalex Percentile: Top 42%
Urban and spatial planning
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Joint Flood Control Operation of Reservoirs in Xiaoshui Basin Based on DP-PS Algorithm · SHILAP Revista de lepidopterología (2024) | TGRS Research Map | TGRS