A Long-Baseline Atom Interferometer at CERN LHC Point 4: Implementation Study

Building on the feasibility study in CERN-PBC Report-2018-002 (Arduini et al. 2018), this report supported by the Physics Beyond Colliders (PBC) Study Group describes the technical implementation of modifications to the PX46 shaft at LHC Point 4 during LS3 (June 2026 - June 2030) that would enable it to accommodate the installation and operation of a vertical long-baseline Atom Interferometer during Run 4 without affecting LHC operations. We specify in detail the necessary civil-engineering work, installation of bespoke radiation shielding, deployment of access-control systems and safety alarms, and design of a mobile elevator platform. Our comprehensive technical assessment identifies no fundamental obstacles or showstoppers to implementation. Refined cost estimates and a critical-path schedule confirm that, from formal approval, all interventions can be completed within a 1.5-year window. These preparations would ensure seamless, concurrent operation of the Atom Interferometer experiment and the HL-LHC, with all technical challenges successfully addressed through established engineering solutions.

Publication Details

Journal
ArXiv.org
Published
2025-08-13
Primary Topic
Atomic and Subatomic Physics Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Long-Baseline Atom Interferometer at CERN LHC Point 4: Implementation Study

ArXiv.org
Atomic and Subatomic Physics Research
article

A Long-Baseline Atom Interferometer at CERN LHC Point 4: Implementation Study

article en

Abstract

Building on the feasibility study in CERN-PBC Report-2018-002 (Arduini et al. 2018), this report supported by the Physics Beyond Colliders (PBC) Study Group describes the technical implementation of modifications to the PX46 shaft at LHC Point 4 during LS3 (June 2026 - June 2030) that would enable it to accommodate the installation and operation of a vertical long-baseline Atom Interferometer during Run 4 without affecting LHC operations. We specify in detail the necessary civil-engineering work, installation of bespoke radiation shielding, deployment of access-control systems and safety alarms, and design of a mobile elevator platform. Our comprehensive technical assessment identifies no fundamental obstacles or showstoppers to implementation. Refined cost estimates and a critical-path schedule confirm that, from formal approval, all interventions can be completed within a 1.5-year window. These preparations would ensure seamless, concurrent operation of the Atom Interferometer experiment and the HL-LHC, with all technical challenges successfully addressed through established engineering solutions.

ArXiv.org
Openalex Percentile: Top 52%
Atomic and Subatomic Physics Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A Long-Baseline Atom Interferometer at CERN LHC Point 4: Implementation Study · ArXiv.org (2025) | TGRS Research Map | TGRS