Vertex-Guided Redundant Constraints Identification for Unit Commitment

Power systems Unit Commitment (UC) problem determines the generator commitment schedule and dispatch decisions to realize the reliable and economic operation of power networks. The growing penetration of stochastic renewables and demand behaviors makes it necessary to solve the UC problem timely. It is possible to derive lightweight, faster-to-solve UC models via constraint screening to eliminate redundant constraints. However, the screening process remains computationally cumbersome due to the need of solving numerous linear programming (LP) problems. To reduce the number of LPs to solve, we introduce a novel perspective on such classic LP-based screening. Our key insights lie in the principle that redundant constraints will be satisfied by all vertices of the screened feasible region. Using the UC decision variables' bounds tightened by solving much fewer LPs, we build an outer approximation for the UC feasible region as the screened region. A matrix operation is then designed and applied to the outer approximation's vertices to identify all redundant constraints on-the-fly. Adjustments for the outer approximation are further explored to improve screening efficiency by considering the load operating range and cutting planes derived from UC cost and discrete unit status prediction. Extensive simulations are performed on a set of testbeds up to 2,383 buses to substantiate the effectiveness of the proposed schemes. Compared to classic LP-based screening, our schemes can achieve up to 8.8x acceleration while finding the same redundant constraints.

Publication Details

Journal
ArXiv.org
Published
2025-07-12
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Vertex-Guided Redundant Constraints Identification for Unit Commitment

ArXiv.org
Electric Power System Optimization
article

Vertex-Guided Redundant Constraints Identification for Unit Commitment

article en

Abstract

Power systems Unit Commitment (UC) problem determines the generator commitment schedule and dispatch decisions to realize the reliable and economic operation of power networks. The growing penetration of stochastic renewables and demand behaviors makes it necessary to solve the UC problem timely. It is possible to derive lightweight, faster-to-solve UC models via constraint screening to eliminate redundant constraints. However, the screening process remains computationally cumbersome due to the need of solving numerous linear programming (LP) problems. To reduce the number of LPs to solve, we introduce a novel perspective on such classic LP-based screening. Our key insights lie in the principle that redundant constraints will be satisfied by all vertices of the screened feasible region. Using the UC decision variables' bounds tightened by solving much fewer LPs, we build an outer approximation for the UC feasible region as the screened region. A matrix operation is then designed and applied to the outer approximation's vertices to identify all redundant constraints on-the-fly. Adjustments for the outer approximation are further explored to improve screening efficiency by considering the load operating range and cutting planes derived from UC cost and discrete unit status prediction. Extensive simulations are performed on a set of testbeds up to 2,383 buses to substantiate the effectiveness of the proposed schemes. Compared to classic LP-based screening, our schemes can achieve up to 8.8x acceleration while finding the same redundant constraints.

ArXiv.org
Openalex Percentile: Top 53%
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Vertex-Guided Redundant Constraints Identification for Unit Commitment · ArXiv.org (2025) | TGRS Research Map | TGRS