The Power of Amortization on Scheduling with Explorable Uncertainty

In this work, we study a scheduling problem with explorable uncertainty. Each job comes with an upper limit of its processing time, which could be potentially reduced by testing the job, which also takes time. The objective is to schedule all jobs on a single machine with a minimum total completion time. The challenge lies in deciding which jobs to test and the order of testing/processing jobs. The online problem was first introduced with unit testing time and later generalized to variable testing times. For this general setting, the upper bounds of the competitive ratio are shown to be $4$ and $3.3794$ for deterministic and randomized online algorithms; while the lower bounds for unit testing time stands, which are $1.8546$ (deterministic) and $1.6257$ (randomized). We continue the study on variable testing times setting. We first enhance the analysis framework and improve the competitive ratio of the deterministic algorithm from $4$ to $1+\sqrt{2} \approx 2.4143$. Using the new analysis framework, we propose a new deterministic algorithm that further improves the competitive ratio to $2.316513$. The new framework also enables us to develop a randomized algorithm improving the expected competitive ratio from $3.3794$ to $2.152271$.

Publication Details

Journal
ArXiv.org
Published
2025-03-17
Primary Topic
Optimization and Search Problems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Power of Amortization on Scheduling with Explorable Uncertainty

ArXiv.org
Optimization and Search Problems
article

The Power of Amortization on Scheduling with Explorable Uncertainty

article en

Abstract

In this work, we study a scheduling problem with explorable uncertainty. Each job comes with an upper limit of its processing time, which could be potentially reduced by testing the job, which also takes time. The objective is to schedule all jobs on a single machine with a minimum total completion time. The challenge lies in deciding which jobs to test and the order of testing/processing jobs. The online problem was first introduced with unit testing time and later generalized to variable testing times. For this general setting, the upper bounds of the competitive ratio are shown to be $4$ and $3.3794$ for deterministic and randomized online algorithms; while the lower bounds for unit testing time stands, which are $1.8546$ (deterministic) and $1.6257$ (randomized). We continue the study on variable testing times setting. We first enhance the analysis framework and improve the competitive ratio of the deterministic algorithm from $4$ to $1+\sqrt{2} \approx 2.4143$. Using the new analysis framework, we propose a new deterministic algorithm that further improves the competitive ratio to $2.316513$. The new framework also enables us to develop a randomized algorithm improving the expected competitive ratio from $3.3794$ to $2.152271$.

ArXiv.org
Decent work and economic growth, Industry, innovation and infrastructure
Openalex Percentile: Top 46%
Optimization and Search Problems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

The Power of Amortization on Scheduling with Explorable Uncertainty · ArXiv.org (2025) | TGRS Research Map | TGRS