Evaluation of logistics factors on successful delivery of building construction projects in South East Nigeria

In most construction locations, many of the projects are facing logistic difficulties due to poor material coordination and inefficient planning. Therefore, this study developed a regression model to evaluate successful project delivery with respect to building construction logistics critical factors. The instruments for data collection and measurement were well-structured questionnaires on a Likert five-point scale, and also a semi-structured in-depth interview with personal observation to obtain responses from construction firms. The survey results were analyzed and interpreted with the use of SPSS software. It was found that the prediction of successful project delivery by the building construction logistic critical factors was not very reliable, with coefficients of determination and correlation of 36.4% and 60.3%, respectively. It was further revealed that only four out of seven critical logistic factor groups have a significant influence on achieving successful project delivery, while three critical logistic factors have no influence on project delivery.

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2024-09-30
DOI
https://doi.org/10.5281/zenodo.14938100
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluation of logistics factors on successful delivery of building construction projects in South East Nigeria

Zenodo (CERN European Organization for Nuclear Research)
Construction Project Management and Performance
article

Evaluation of logistics factors on successful delivery of building construction projects in South East Nigeria

article en

Abstract

In most construction locations, many of the projects are facing logistic difficulties due to poor material coordination and inefficient planning. Therefore, this study developed a regression model to evaluate successful project delivery with respect to building construction logistics critical factors. The instruments for data collection and measurement were well-structured questionnaires on a Likert five-point scale, and also a semi-structured in-depth interview with personal observation to obtain responses from construction firms. The survey results were analyzed and interpreted with the use of SPSS software. It was found that the prediction of successful project delivery by the building construction logistic critical factors was not very reliable, with coefficients of determination and correlation of 36.4% and 60.3%, respectively. It was further revealed that only four out of seven critical logistic factor groups have a significant influence on achieving successful project delivery, while three critical logistic factors have no influence on project delivery.

Zenodo (CERN European Organization for Nuclear Research)
Federal University of Technology Owerri (NG)
Openalex Percentile: Top 45%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Evaluation of logistics factors on successful delivery of building construction projects in South East Nigeria · Zenodo (CERN European Organization for Nuclear Research) (2024) | TGRS Research Map | TGRS