The Impact of Construction Material Supply Delays on Contractor X in Jakarta, Indonesia

Construction materials are the main component in the physical implementation of the work, so their availability on time, in the right amount, and according to specifications greatly affects the smooth running of activities in the field. Without good planning and management of material procurement, projects are at risk of delays, cost overruns, and even a decrease in the quality of work results. In addition, an inefficient procurement system can cause disruptions to work schedules, reduce labor productivity, and trigger conflicts between contractors, suppliers, and project owners. This research was conducted at contractor X using a survey method (questionnaire) to determine the Impact of Material Supply Delays. The results indicated a positive relationship between the variables “Delay in Supply of Construction Materials” (X) and “Impact on Contractor X” (Y) with a regression equation Y = 11.524 + 0.141X. While the correlation also shows a positive relationship between the two variables. This is a very meaningful input for contractor X, so they must make careful planning regarding the supply of construction materials for each project undertaken.

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-05-02
DOI
https://doi.org/10.5281/zenodo.15321598
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Impact of Construction Material Supply Delays on Contractor X in Jakarta, Indonesia

Zenodo (CERN European Organization for Nuclear Research)
Construction Project Management and Performance
article

The Impact of Construction Material Supply Delays on Contractor X in Jakarta, Indonesia

article en

Abstract

Construction materials are the main component in the physical implementation of the work, so their availability on time, in the right amount, and according to specifications greatly affects the smooth running of activities in the field. Without good planning and management of material procurement, projects are at risk of delays, cost overruns, and even a decrease in the quality of work results. In addition, an inefficient procurement system can cause disruptions to work schedules, reduce labor productivity, and trigger conflicts between contractors, suppliers, and project owners. This research was conducted at contractor X using a survey method (questionnaire) to determine the Impact of Material Supply Delays. The results indicated a positive relationship between the variables “Delay in Supply of Construction Materials” (X) and “Impact on Contractor X” (Y) with a regression equation Y = 11.524 + 0.141X. While the correlation also shows a positive relationship between the two variables. This is a very meaningful input for contractor X, so they must make careful planning regarding the supply of construction materials for each project undertaken.

Zenodo (CERN European Organization for Nuclear Research)
Decent work and economic growth
Openalex Percentile: Top 44%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

The Impact of Construction Material Supply Delays on Contractor X in Jakarta, Indonesia · Zenodo (CERN European Organization for Nuclear Research) (2025) | TGRS Research Map | TGRS