IMPLEMENTING CONTROLLED EARNED VALUE MANAGEMENT TECHNIQUES IN CONSTRUCTION

The Earned Value Method is crucial for project forecasting because it provides an integrated approach to measuring cost, schedule, and performance which enables project managers in early identifying the deviations in the projects. Therefore, the study aimed to explore the role of earned value methodology in the construction projects of private and public sector buildings. For this purpose, the case study approach and quantitative data collected were analyzed on the cost performance index, schedule performance index, and cost variance percentage. The Project One public sector university building construction results indicated that the cost performance index was lower than 1 which indicated that there was no proper implementation of the earned value method in the cost forecasting. On the other hand, in project two which was conducted on the construction of a private university building, the cost performance index was greater than 1 which showed the importance of the earned value method in controlling the cost. The cost variance percentage of Project One was found negative while Project two cost variance percentage was also positive which also showed the proper implementation of the earned value method in their construction. The study with results highlighted the crucial role of the Earned Value Method EVM in cost control and forecasting which demonstrates that its proper implementation leads to better financial performance in construction projects. The comparison between public and private sector projects emphasizes the need for stricter EVM adoption in public-sector construction to improve cost efficiency.

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2024-09-30
DOI
https://doi.org/10.5281/zenodo.15093162
Primary Topic
Value Engineering and Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

IMPLEMENTING CONTROLLED EARNED VALUE MANAGEMENT TECHNIQUES IN CONSTRUCTION

Zenodo (CERN European Organization for Nuclear Research)
Value Engineering and Management
article

IMPLEMENTING CONTROLLED EARNED VALUE MANAGEMENT TECHNIQUES IN CONSTRUCTION

article en

Abstract

The Earned Value Method is crucial for project forecasting because it provides an integrated approach to measuring cost, schedule, and performance which enables project managers in early identifying the deviations in the projects. Therefore, the study aimed to explore the role of earned value methodology in the construction projects of private and public sector buildings. For this purpose, the case study approach and quantitative data collected were analyzed on the cost performance index, schedule performance index, and cost variance percentage. The Project One public sector university building construction results indicated that the cost performance index was lower than 1 which indicated that there was no proper implementation of the earned value method in the cost forecasting. On the other hand, in project two which was conducted on the construction of a private university building, the cost performance index was greater than 1 which showed the importance of the earned value method in controlling the cost. The cost variance percentage of Project One was found negative while Project two cost variance percentage was also positive which also showed the proper implementation of the earned value method in their construction. The study with results highlighted the crucial role of the Earned Value Method EVM in cost control and forecasting which demonstrates that its proper implementation leads to better financial performance in construction projects. The comparison between public and private sector projects emphasizes the need for stricter EVM adoption in public-sector construction to improve cost efficiency.

Zenodo (CERN European Organization for Nuclear Research)
University of Business and Technology (SA)
Industry, innovation and infrastructure
Openalex Percentile: Top 36%
Value Engineering and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.