Risk Assessment of Water Structure Projects Using Fuzzy Multi-Attribute Decision-Making Methods: Fuzzy OWA and Fuzzy SAW (Case Study: S1 Wellhead Platform in the Salman Oil Field)

Civil engineering projects, including the construction of oil platforms, are inherently associated with various types of risks from different perspectives. Risk management in large-scale water and marine structure projects, such as the construction of oil platforms, is essential due to the multiple uncertainties and extensive environmental and human factors involved. Identifying, assessing, and prioritizing risks are critical steps in managing these projects effectively. This study aims to identify and rank key risks in the construction of an oil platform using fuzzy multi-attribute decision-making models. In this research, risks in the areas of engineering, execution, passive defense, and the environment were identified through a literature review and expert consultation using brainstorming techniques. Subsequently, a risk management team identified 21 key risks and established 8 evaluation criteria through focused group discussions. To achieve the research objectives, two questionnaires were developed. The first questionnaire was used to form a pairwise comparison matrix and determine the weights of the criteria using the Fuzzy Buckley method, while the second questionnaire assessed the importance of the risks. The collected data were analyzed using the Fuzzy Simple Additive Weighting (SAW) and Ordered Weighted Averaging (OWA) methods. The results indicated that the primary risks were related to the execution phase, highlighting the need for special attention to these risks to improve project outcomes. Unlike many traditional methods, the fuzzy OWA method effectively incorporates the subjective characteristics, risk appetite, and risk aversion of decision-makers, proving to be efficient in risk evaluation.

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2024-09-01
DOI
https://doi.org/10.22077/jwhr.2025.8545.1161
Primary Topic
Risk and Safety Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Risk Assessment of Water Structure Projects Using Fuzzy Multi-Attribute Decision-Making Methods: Fuzzy OWA and Fuzzy SAW (Case Study: S1 Wellhead Platform in the Salman Oil Field)

SHILAP Revista de lepidopterología
Risk and Safety Analysis
article

Risk Assessment of Water Structure Projects Using Fuzzy Multi-Attribute Decision-Making Methods: Fuzzy OWA and Fuzzy SAW (Case Study: S1 Wellhead Platform in the Salman Oil Field)

article en

Abstract

Civil engineering projects, including the construction of oil platforms, are inherently associated with various types of risks from different perspectives. Risk management in large-scale water and marine structure projects, such as the construction of oil platforms, is essential due to the multiple uncertainties and extensive environmental and human factors involved. Identifying, assessing, and prioritizing risks are critical steps in managing these projects effectively. This study aims to identify and rank key risks in the construction of an oil platform using fuzzy multi-attribute decision-making models. In this research, risks in the areas of engineering, execution, passive defense, and the environment were identified through a literature review and expert consultation using brainstorming techniques. Subsequently, a risk management team identified 21 key risks and established 8 evaluation criteria through focused group discussions. To achieve the research objectives, two questionnaires were developed. The first questionnaire was used to form a pairwise comparison matrix and determine the weights of the criteria using the Fuzzy Buckley method, while the second questionnaire assessed the importance of the risks. The collected data were analyzed using the Fuzzy Simple Additive Weighting (SAW) and Ordered Weighted Averaging (OWA) methods. The results indicated that the primary risks were related to the execution phase, highlighting the need for special attention to these risks to improve project outcomes. Unlike many traditional methods, the fuzzy OWA method effectively incorporates the subjective characteristics, risk appetite, and risk aversion of decision-makers, proving to be efficient in risk evaluation.

SHILAP Revista de lepidopterología
Life below water
Openalex Percentile: Top 45%
Risk and Safety Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Risk Assessment of Water Structure Projects Using Fuzzy Multi-Attribute Decision-Making Methods: Fuzzy OWA and Fuzzy SAW (Case Study: S1 Wellhead Platform in the Salman Oil Field) · SHILAP Revista de lepidopterología (2024) | TGRS Research Map | TGRS