Status of the CEA contribution to the PIP-II linear accelerator
The Proton Improvement Plan II (PIP-II) project at Fermilab is the first U.S. accelerator project that will have significant in-kind contributions (IKC) from international partners. CEA joined the international collaboration in 2018 and will deliver 10 low-beta cryomodules as IKC to the PIP-II project, with cavities supplied by INFN-LASA (Italy) and DAE-VECC (India), and power couplers and tuning systems supplied by Fermilab. An important milestone was reached in April 2023 with the Final Design Review of the cryomodule, launching the pre-production phase. This paper presents the status of the CEA activities on the construction of the LB650 pre-production cryomodule and the upgrade of the existing assembly and test infrastructures to the PIP-II requirements.
Institutions
- Commissariat à l'Énergie Atomique et aux Énergies Alternatives (FR)
Publication Details
- Journal
- JACOW
- Published
- 2024-10-25
- DOI
- https://doi.org/10.18429/jacow-linac2024-thpb010
- Primary Topic
- Particle accelerators and beam dynamics
- Type
- article
- Field-Weighted Citation Impact
- 0.00