Preliminary Research and Development of BPM Electronics Upgrade for the RCS Ring in CSNS II

The first phase of the China Spallation Neutron Source (CSNS) project aims to accelerate negative hydrogen ions to 80 MeV using a linear accelerator. Subsequently, these negative hydrogen ions are converted into protons after stripping, and then injected into a rapid cycling proton synchrotron. The proton beam is further accelerated to an energy of 1.6 GeV and guided through a beam transport line to a tungsten target, where spallation reactions gen-erate neutrons. With the initiation of the Phase II project of the China Spallation Neutron Source (CSNS II), the target power is anticipated to increase significantly to 500 kW in the future. Upgrading the existing 32 sets of BPM electronics on the Rapid Cycling Synchrotron (RCS) ring is essential to accommodate the enhanced beam power and fulfill the new requirements of the beam measurement. This paper focuses on the novel design and validation of the BPM electronics, as well as the execu-tion of tests during beam operation.

Publication Details

Journal
JACOW
Published
2024-12-18
DOI
https://doi.org/10.18429/jacow-ibic2024-tup26
Primary Topic
Communism, Protests, Social Movements
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Preliminary Research and Development of BPM Electronics Upgrade for the RCS Ring in CSNS II

JACOW
Communism, Protests, Social Movements
article

Preliminary Research and Development of BPM Electronics Upgrade for the RCS Ring in CSNS II

article en

Abstract

The first phase of the China Spallation Neutron Source (CSNS) project aims to accelerate negative hydrogen ions to 80 MeV using a linear accelerator. Subsequently, these negative hydrogen ions are converted into protons after stripping, and then injected into a rapid cycling proton synchrotron. The proton beam is further accelerated to an energy of 1.6 GeV and guided through a beam transport line to a tungsten target, where spallation reactions gen-erate neutrons. With the initiation of the Phase II project of the China Spallation Neutron Source (CSNS II), the target power is anticipated to increase significantly to 500 kW in the future. Upgrading the existing 32 sets of BPM electronics on the Rapid Cycling Synchrotron (RCS) ring is essential to accommodate the enhanced beam power and fulfill the new requirements of the beam measurement. This paper focuses on the novel design and validation of the BPM electronics, as well as the execu-tion of tests during beam operation.

JACOW
Affordable and clean energy
Openalex Percentile: Top 36%
Communism, Protests, Social Movements
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Preliminary Research and Development of BPM Electronics Upgrade for the RCS Ring in CSNS II · JACOW (2024) | TGRS Research Map | TGRS