Troubleshooting the Ionization Profile Monitor (IPM) for CSNS 1.6 GeV RCS

Non-invasive and turn-by-turn beam transverse profile monitoring is essential for the tunning and operating CSNS 1.6 GeV Rapid Cyclic Synchrotron. A residual gas Ionization Profile Monitor (IPM) was designed and installed in RCS for horizontal beam profile measurement. However, several challenges related to electromagnetic interference (EMI), vacuum, and MCP operation in the IPM were identified. The EMI is induced by the beam itself and further accelerator components. An improved Faraday cage was implemented to counteract the EMI issues. In order to achieve the desired MCP gain, a suitable pull-down resistor was incorporated into the MCP power supply circuit. After these improvements, the IPM was commissioned successfully. This paper will describe the challenges of IPM and early beam commissioning results.

Publication Details

Journal
DORA PSI (Paul Scherrer Institute)
Published
2024-12-18
DOI
https://doi.org/10.18429/jacow-ibic2024-wep18
Primary Topic
Particle Accelerators and Free-Electron Lasers
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Troubleshooting the Ionization Profile Monitor (IPM) for CSNS 1.6 GeV RCS

DORA PSI (Paul Scherrer Institute)
Particle Accelerators and Free-Electron Lasers
article

Troubleshooting the Ionization Profile Monitor (IPM) for CSNS 1.6 GeV RCS

article en

Abstract

Non-invasive and turn-by-turn beam transverse profile monitoring is essential for the tunning and operating CSNS 1.6 GeV Rapid Cyclic Synchrotron. A residual gas Ionization Profile Monitor (IPM) was designed and installed in RCS for horizontal beam profile measurement. However, several challenges related to electromagnetic interference (EMI), vacuum, and MCP operation in the IPM were identified. The EMI is induced by the beam itself and further accelerator components. An improved Faraday cage was implemented to counteract the EMI issues. In order to achieve the desired MCP gain, a suitable pull-down resistor was incorporated into the MCP power supply circuit. After these improvements, the IPM was commissioned successfully. This paper will describe the challenges of IPM and early beam commissioning results.

DORA PSI (Paul Scherrer Institute)
Affordable and clean energy
Openalex Percentile: Top 65%
Particle Accelerators and Free-Electron Lasers
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Troubleshooting the Ionization Profile Monitor (IPM) for CSNS 1.6 GeV RCS · DORA PSI (Paul Scherrer Institute) (2024) | TGRS Research Map | TGRS