Completion of Phase B+ beam commissioning of Linear IFMIF Prototype Accelerator (LIPAc)

The Engineering Validation and Engineering Design Activities for the International Fusion Materials Irradiation Facility (IFMIF/EVEDA) are being pursued under the Broader Approach agreement between EURATOM and the Japanese government. The Linear IFMIF Prototype Accelerator (LIPAc) is under commissioning in Rokkasho, Japan to demonstrate the feasibility of the high duty (CW) and high current (125mA) deuteron beam operation. Currently, the LIPAc beamline is in its final configuration, except for the SRF linac currently replaced by a temporary beam transport line, and is undergoing a high duty cycle RFQ operation up to 5 MeV, which is called Phase B+ and is planned to be completed by the end of June 2024. The major goals of this phase are to validate the RFQ, MEBT and Beam Dump performances at high duty cycle and to characterize the beam properties in preparation to the final configuration with the SRF linac. As of the end of April 2024, a beam current of about 115 mA, a pulse length of up to 3 ms and duty cycle of up to about 4% have been successfully achieved. After the completion of the Phase B+, the SRF will be delivered to the accelerator room and installed in the beamline. This paper will present the results of the Phase B+.

Institutions

Publication Details

Journal
JACOW
Published
2024-10-25
DOI
https://doi.org/10.18429/jacow-linac2024-thpb036
Primary Topic
Particle accelerators and beam dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Completion of Phase B+ beam commissioning of Linear IFMIF Prototype Accelerator (LIPAc)

JACOW
Particle accelerators and beam dynamics
article

Completion of Phase B+ beam commissioning of Linear IFMIF Prototype Accelerator (LIPAc)

article en

Abstract

The Engineering Validation and Engineering Design Activities for the International Fusion Materials Irradiation Facility (IFMIF/EVEDA) are being pursued under the Broader Approach agreement between EURATOM and the Japanese government. The Linear IFMIF Prototype Accelerator (LIPAc) is under commissioning in Rokkasho, Japan to demonstrate the feasibility of the high duty (CW) and high current (125mA) deuteron beam operation. Currently, the LIPAc beamline is in its final configuration, except for the SRF linac currently replaced by a temporary beam transport line, and is undergoing a high duty cycle RFQ operation up to 5 MeV, which is called Phase B+ and is planned to be completed by the end of June 2024. The major goals of this phase are to validate the RFQ, MEBT and Beam Dump performances at high duty cycle and to characterize the beam properties in preparation to the final configuration with the SRF linac. As of the end of April 2024, a beam current of about 115 mA, a pulse length of up to 3 ms and duty cycle of up to about 4% have been successfully achieved. After the completion of the Phase B+, the SRF will be delivered to the accelerator room and installed in the beamline. This paper will present the results of the Phase B+.

JACOW
Japan Synchrotron Radiation Research Institute (JP), National Institutes for Quantum Science and Technology (JP), Ian's Friends Foundation (US), Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas (ES), Fusion for Energy (ES)
Industry, innovation and infrastructure
Openalex Percentile: Top 32%
Particle accelerators and beam dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.