Thoughts on Early Involvement in the Operation of Shanghai Newly-Built City Railway

[Objective] By sorting out the construction and operation characteristics of the newly-built city railways in Shanghai and summarizing the existing problems in the early involvement work, suggestions for carrying out the early involvement in operation are put forward so as to improve the efficiency of operation preparation and promote the healthy and sustainable development of city railways in Shanghai. [Method] Firstly, by reviewing the general situation of the planning and construction of the newly-built city railways in Shanghai, it is summarized that the city railways in Shanghai have the characteristics such as construction and operation separation, networked operation, interconnection, etc. Moreover, as the newly-built city railway network is expanding rapidly, time for construction and operation preparation work is tight, resulting in greater pressure on the connection between construction and operation in the line construction process. Therefore, the need for early involvement is urgent. Secondly, the existing problems in the early involvement of the newly-built city railways are analyzed, such as unsmooth coordination in construction and operation preparation, imperfect mechanisms, and incomplete standards. [Result & Conclusion] From the perspectives of the superior competent department, the construction party, and the operation party, relevant countermeasures and suggestions for improving the early involvement work in the newly-built city railways are put forward. It is recommended starting from three aspects, including strengthening the superior management, establishing and improving the early involvement working mode, and enhancing the building of the standard system, to clarify the role positioning of both the construction and operation parties, and improve the working mechanism of superior management. The key work stages should be scientifically divided, and a complete early involvement organizational structure be constructed, and diversified forms of early involvement be adopted. The user demand document for city railways should be compiled, the integrated management of the standard system be strengthened. Communication and cooperation among the three parties should be enhanced, and the working mechanism of early involvement be improved to raise the involvement efficiency.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2025-05-01
DOI
https://doi.org/10.16037/j.1007-869x.2025.05.035
Citations
1
Primary Topic
Railway Systems and Energy Efficiency
Type
article
Field-Weighted Citation Impact
1.24
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Thoughts on Early Involvement in the Operation of Shanghai Newly-Built City Railway

1 citations
SHILAP Revista de lepidopterología
Railway Systems and Energy Efficiency
1.24
article

Thoughts on Early Involvement in the Operation of Shanghai Newly-Built City Railway

article en
1 citations

Abstract

[Objective] By sorting out the construction and operation characteristics of the newly-built city railways in Shanghai and summarizing the existing problems in the early involvement work, suggestions for carrying out the early involvement in operation are put forward so as to improve the efficiency of operation preparation and promote the healthy and sustainable development of city railways in Shanghai. [Method] Firstly, by reviewing the general situation of the planning and construction of the newly-built city railways in Shanghai, it is summarized that the city railways in Shanghai have the characteristics such as construction and operation separation, networked operation, interconnection, etc. Moreover, as the newly-built city railway network is expanding rapidly, time for construction and operation preparation work is tight, resulting in greater pressure on the connection between construction and operation in the line construction process. Therefore, the need for early involvement is urgent. Secondly, the existing problems in the early involvement of the newly-built city railways are analyzed, such as unsmooth coordination in construction and operation preparation, imperfect mechanisms, and incomplete standards. [Result & Conclusion] From the perspectives of the superior competent department, the construction party, and the operation party, relevant countermeasures and suggestions for improving the early involvement work in the newly-built city railways are put forward. It is recommended starting from three aspects, including strengthening the superior management, establishing and improving the early involvement working mode, and enhancing the building of the standard system, to clarify the role positioning of both the construction and operation parties, and improve the working mechanism of superior management. The key work stages should be scientifically divided, and a complete early involvement organizational structure be constructed, and diversified forms of early involvement be adopted. The user demand document for city railways should be compiled, the integrated management of the standard system be strengthened. Communication and cooperation among the three parties should be enhanced, and the working mechanism of early involvement be improved to raise the involvement efficiency.

SHILAP Revista de lepidopterología
Tongji University (CN), China Railway Shanghai Design Institute Group (China) (CN)
Sustainable cities and communities
Openalex Percentile: Top 13%
Railway Systems and Energy Efficiency
1.24
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.