Protection Measures for Shield Tunneling Closely Under-passing Operating Metro Tunnels in Water-rich Soft Soil Area

[Objective] In water-rich soft soil areas, it is difficult to control the deformation of the existing operating metro tunnel structure caused by the construction of the shield tunneling closely under-passing. Therefore, it is necessary to conduct research on corresponding protection measures. [Method] Based on a project of Nanjing Metro Line 5 shield tunneling closely under-passing the existing section of Nanjing Metro Line 1, the MIDAS/GTS NX finite element software is used to simulate the construction of the shield tunneling. Then, active protection measures for the existing tunnel and control measures for the shield tunneling of the newly-built tunnel are put forward. The vertical displacement and horizontal convergence of the existing tunnel during the shield under-passing are monitored with construction monitoring methods. [Result & Conclusion] The specific construction protection measures are as follows. Before the construction of shield tunneling under-passing, the affected sections of the existing tunnel are reinforced with measures such as micro-disturbance grouting, permanent circumferential supports, and longitudinal tension strips to effectively reduce the tunnel deformation and make it conform to the deformation control standards. During the construction, the earth pressure and the amount of excavated soil are adjusted in real time based on the settlement amount of the existing tunnel, and methods are adopted including synchronous grouting and the distribution of grouting amounts in the upper and lower holes to further control the tunnel deformation. After the completion of construction, against the post-construction settlement problem of the stratum, sufficient grouting material and equipment for reinforcing grouting are prepared inside the tunnel section where the shield tunneling underpasses, and subsequent grouting reinforcement is carried out according to the monitored settlement. The above measures can effectively reduce the impact of the shield tunneling under-passing construction on the existing tunnel.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2025-01-01
DOI
https://doi.org/10.16037/j.1007-869x.2025.01.006
Primary Topic
Civil and Geotechnical Engineering Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Protection Measures for Shield Tunneling Closely Under-passing Operating Metro Tunnels in Water-rich Soft Soil Area

SHILAP Revista de lepidopterología
Civil and Geotechnical Engineering Research
article

Protection Measures for Shield Tunneling Closely Under-passing Operating Metro Tunnels in Water-rich Soft Soil Area

article en

Abstract

[Objective] In water-rich soft soil areas, it is difficult to control the deformation of the existing operating metro tunnel structure caused by the construction of the shield tunneling closely under-passing. Therefore, it is necessary to conduct research on corresponding protection measures. [Method] Based on a project of Nanjing Metro Line 5 shield tunneling closely under-passing the existing section of Nanjing Metro Line 1, the MIDAS/GTS NX finite element software is used to simulate the construction of the shield tunneling. Then, active protection measures for the existing tunnel and control measures for the shield tunneling of the newly-built tunnel are put forward. The vertical displacement and horizontal convergence of the existing tunnel during the shield under-passing are monitored with construction monitoring methods. [Result & Conclusion] The specific construction protection measures are as follows. Before the construction of shield tunneling under-passing, the affected sections of the existing tunnel are reinforced with measures such as micro-disturbance grouting, permanent circumferential supports, and longitudinal tension strips to effectively reduce the tunnel deformation and make it conform to the deformation control standards. During the construction, the earth pressure and the amount of excavated soil are adjusted in real time based on the settlement amount of the existing tunnel, and methods are adopted including synchronous grouting and the distribution of grouting amounts in the upper and lower holes to further control the tunnel deformation. After the completion of construction, against the post-construction settlement problem of the stratum, sufficient grouting material and equipment for reinforcing grouting are prepared inside the tunnel section where the shield tunneling underpasses, and subsequent grouting reinforcement is carried out according to the monitored settlement. The above measures can effectively reduce the impact of the shield tunneling under-passing construction on the existing tunnel.

SHILAP Revista de lepidopterología
Tongji University (CN), Shanghai Tunnel Engineering (China) (CN), Jiangsu Institute of Metrology (CN)
Sustainable cities and communities
Openalex Percentile: Top 27%
Civil and Geotechnical Engineering Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.