Financing strategies for renewable energy expansion in South Africa

South Africa faces an energy crisis caused by its underperforming coal power stations and, therefore, needs to solve the maintenance challenges at these coal power stations to address the current energy shortages. In the long term, the country plans to expand its renewable energy procurement from the private sector through the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP), which depends on the private sector's ability to secure fi nance for plant construction. During the REIPPPP bidding window (BW) 5 of 2021, it was confi rmed that the average cost of renewable energy generation from solar and wind alternatives was cheaper than coal-based energy. In addition, these projects have a shorter construction phase, often reaching the operational phase within two years after concluding a Power-Purchase Agreement with Eskom or a municipality. However, significant fi nancing is required to achieve the 2019 Integrated Resource Plan's (IRP) renewable energy targets, given that the Industrial Development Corporation (IDC) estimates the country needs to allocate ZAR 8,9 trillion to achieve its 2030 targets.

Publication Details

Journal
Figshare
Published
2025-03-24
DOI
https://doi.org/10.14749/28649552
Primary Topic
Energy and Environment Impacts
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Financing strategies for renewable energy expansion in South Africa

Figshare
Energy and Environment Impacts
article

Financing strategies for renewable energy expansion in South Africa

article en

Abstract

South Africa faces an energy crisis caused by its underperforming coal power stations and, therefore, needs to solve the maintenance challenges at these coal power stations to address the current energy shortages. In the long term, the country plans to expand its renewable energy procurement from the private sector through the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP), which depends on the private sector's ability to secure fi nance for plant construction. During the REIPPPP bidding window (BW) 5 of 2021, it was confi rmed that the average cost of renewable energy generation from solar and wind alternatives was cheaper than coal-based energy. In addition, these projects have a shorter construction phase, often reaching the operational phase within two years after concluding a Power-Purchase Agreement with Eskom or a municipality. However, significant fi nancing is required to achieve the 2019 Integrated Resource Plan's (IRP) renewable energy targets, given that the Industrial Development Corporation (IDC) estimates the country needs to allocate ZAR 8,9 trillion to achieve its 2030 targets.

Figshare
Openalex Percentile: Top 61%
Energy and Environment Impacts
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.