Leveraging SurgeCapacity for Sustainable ProcessOperation: Control Structure

The impact of the material balance control structure on economic and sustainable process operation is evaluated using linear analysis as well as two rigorous case studies on an ester purification process and an acetone manufacturing process. Three alternative control structures with the throughput manipulator (TPM) at the fresh feed (CS1), at the feed to the first major unit operation inside the recycle loop (CS2), and at the bottleneck capacity constraint that limits maximum throughput (CS3) are evaluated. Dynamic results for backed-off operation at a given throughput (Mode I) and maximum throughput (Mode II) limited by a capacity constraint are obtained for realistic disturbances. The plantwide results show that CS3 and CS2, in that order, achieve significant Mode I energy savings (up to 13%) and higher Mode II maximum throughputs (up to 7%) compared to CS1 (conventional structure) as the active constraint control is significantly tighter due to the propagation of plantwide flow transients and nonlinearity out of the recycle loop. The use of supervisory MPC on top of CS1 recovers the economic loss only partially compared to CS2 and CS3 with their TPM inside the recycle loop. Based on the case studies, locating the TPM at the bottleneck constraint inside the recycle loop is strongly recommended.

Publication Details

Journal
Figshare
Published
2025-01-15
DOI
https://doi.org/10.1021/acs.iecr.4c03646.s001
Primary Topic
Process Optimization and Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Leveraging SurgeCapacity for Sustainable ProcessOperation: Control Structure

Figshare
Process Optimization and Integration
article

Leveraging SurgeCapacity for Sustainable ProcessOperation: Control Structure

article en

Abstract

The impact of the material balance control structure on economic and sustainable process operation is evaluated using linear analysis as well as two rigorous case studies on an ester purification process and an acetone manufacturing process. Three alternative control structures with the throughput manipulator (TPM) at the fresh feed (CS1), at the feed to the first major unit operation inside the recycle loop (CS2), and at the bottleneck capacity constraint that limits maximum throughput (CS3) are evaluated. Dynamic results for backed-off operation at a given throughput (Mode I) and maximum throughput (Mode II) limited by a capacity constraint are obtained for realistic disturbances. The plantwide results show that CS3 and CS2, in that order, achieve significant Mode I energy savings (up to 13%) and higher Mode II maximum throughputs (up to 7%) compared to CS1 (conventional structure) as the active constraint control is significantly tighter due to the propagation of plantwide flow transients and nonlinearity out of the recycle loop. The use of supervisory MPC on top of CS1 recovers the economic loss only partially compared to CS2 and CS3 with their TPM inside the recycle loop. Based on the case studies, locating the TPM at the bottleneck constraint inside the recycle loop is strongly recommended.

Figshare
Openalex Percentile: Top 46%
Process Optimization and Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Leveraging SurgeCapacity for Sustainable ProcessOperation: Control Structure · Figshare (2025) | TGRS Research Map | TGRS