Sustainability and Stakeholder Engagement in Building Information Modelling-Enabled Construction: A Review of Critical Success Factors in Design and Planning Phases

This scoping literature review examines critical success factors (CSFs) in the design and planning phases of BIM-enabled construction projects, focusing on integrating sustainability practices across the quadruple bottom line: profit, people, planet, and process. By introducing the novel ‘Process’ pillar, this study aims to bridge critical gaps in sustainability research, emphasising technology-driven practices and mapping 62 CSFs from 31 studies to specific stakeholder roles, and focuses on early project phases in which decisions have the most significant impact on long-term outcomes. The findings highlight how early-phase decisions, guided by the QBL framework, can optimise project outcomes and drive long-term sustainability through effective stakeholder engagement. Despite advancements, the design and planning phases of BIM-enabled construction projects consistently exhibit an underrepresentation of end users and environmental considerations. These omissions highlight inadequacies in stakeholder engagement, which are critical for achieving comprehensive sustainability and aligning project outcomes with user needs and environmental goals. This research maps CSFs to corresponding stakeholders, revealing a complex network with the BIM coordinator/manager playing a pivotal role. This mapping underscores the importance of integrating stakeholder inputs, particularly from end users, early in the project lifecycle to enhance functionality and ensure the long-term viability of construction projects. However, current practices often overlook this, leading to a potential misalignment between project deliverables and user expectations. The construction industry can move towards more sustainable, efficient, and user-focused outcomes by addressing these gaps. This study calls for a paradigm shift in BIM methodologies to adopt a construction environment that is not only efficient but also adaptable to the needs of its users and the environmental imperatives of today’s world.

Institutions

Publication Details

Journal
Research Online (University of Wollongong)
Published
2025-01-01
DOI
https://doi.org/10.71747/uow-r3gk326m.29817233
Primary Topic
Geophysics and Sensor Technology
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Sustainability and Stakeholder Engagement in Building Information Modelling-Enabled Construction: A Review of Critical Success Factors in Design and Planning Phases

Research Online (University of Wollongong)
Geophysics and Sensor Technology
article

Sustainability and Stakeholder Engagement in Building Information Modelling-Enabled Construction: A Review of Critical Success Factors in Design and Planning Phases

article en

Abstract

This scoping literature review examines critical success factors (CSFs) in the design and planning phases of BIM-enabled construction projects, focusing on integrating sustainability practices across the quadruple bottom line: profit, people, planet, and process. By introducing the novel ‘Process’ pillar, this study aims to bridge critical gaps in sustainability research, emphasising technology-driven practices and mapping 62 CSFs from 31 studies to specific stakeholder roles, and focuses on early project phases in which decisions have the most significant impact on long-term outcomes. The findings highlight how early-phase decisions, guided by the QBL framework, can optimise project outcomes and drive long-term sustainability through effective stakeholder engagement. Despite advancements, the design and planning phases of BIM-enabled construction projects consistently exhibit an underrepresentation of end users and environmental considerations. These omissions highlight inadequacies in stakeholder engagement, which are critical for achieving comprehensive sustainability and aligning project outcomes with user needs and environmental goals. This research maps CSFs to corresponding stakeholders, revealing a complex network with the BIM coordinator/manager playing a pivotal role. This mapping underscores the importance of integrating stakeholder inputs, particularly from end users, early in the project lifecycle to enhance functionality and ensure the long-term viability of construction projects. However, current practices often overlook this, leading to a potential misalignment between project deliverables and user expectations. The construction industry can move towards more sustainable, efficient, and user-focused outcomes by addressing these gaps. This study calls for a paradigm shift in BIM methodologies to adopt a construction environment that is not only efficient but also adaptable to the needs of its users and the environmental imperatives of today’s world.

Research Online (University of Wollongong)
University of Wollongong (AU)
Industry, innovation and infrastructure
Openalex Percentile: Top 46%
Geophysics and Sensor Technology
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Sustainability and Stakeholder Engagement in Building Information Modelling-Enabled Construction: A Review of Critical Success Factors in Design and Planning Phases · Research Online (University of Wollongong) (2025) | TGRS Research Map | TGRS