Concept of a Geothermal Extended Reach Well in Munich

In order to maximize the potential of deep geothermal energy in Munich, while at the same time reducing the number of drilling sites, development costs and the implementation time of geothermal projects, it is important that individual well sites achieve the highest possible production rates. One evident strategy to enhance the productivity of a drilling site is to expand the development radius around the location as well as the number of boreholes. Wells in the Munich area have been drilled up to 3,000 m horizontal departure (HD), but there is potential for further horizontal reach. However, this requires the outer wells to be drilled at a considerable distance, almost horizontally, from the surface starting point to the landing point. This increasing horizontal distance of the target from the well site inevitably leads to increased technical effort, cost and risk. This paper presents the challenges and limitations arising when applying conventional drilling and liner running methods on wells with extended reach. A thorough risk analysis is provided, detailing the identified limitations. Additionally, various aspects of the well design are highlighted and reviewed.

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2024-10-23
DOI
https://doi.org/10.5281/zenodo.14844139
Primary Topic
Botany, Ecology, and Taxonomy Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Concept of a Geothermal Extended Reach Well in Munich

Zenodo (CERN European Organization for Nuclear Research)
Botany, Ecology, and Taxonomy Studies
article

Concept of a Geothermal Extended Reach Well in Munich

article en

Abstract

In order to maximize the potential of deep geothermal energy in Munich, while at the same time reducing the number of drilling sites, development costs and the implementation time of geothermal projects, it is important that individual well sites achieve the highest possible production rates. One evident strategy to enhance the productivity of a drilling site is to expand the development radius around the location as well as the number of boreholes. Wells in the Munich area have been drilled up to 3,000 m horizontal departure (HD), but there is potential for further horizontal reach. However, this requires the outer wells to be drilled at a considerable distance, almost horizontally, from the surface starting point to the landing point. This increasing horizontal distance of the target from the well site inevitably leads to increased technical effort, cost and risk. This paper presents the challenges and limitations arising when applying conventional drilling and liner running methods on wells with extended reach. A thorough risk analysis is provided, detailing the identified limitations. Additionally, various aspects of the well design are highlighted and reviewed.

Zenodo (CERN European Organization for Nuclear Research)
Industry, innovation and infrastructure
Openalex Percentile: Top 43%
Botany, Ecology, and Taxonomy Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.