Calculation of the Filling Amount of Working Fluid to be Placed in a Heat Pipe

In this article, the working fluid to be placed in the Heat Pipes of a selected Heat Pipe Air Recuperator and the filling amount of this fluid will be determined by calculation. In the heat pipe air recuperator selected for calculations, there are a total of 18 heat pipes to be filled with working fluid. The amount of working fluid to be filled into each heat pipe is determined by calculation, and the inside of the pipes are put under vacuum before filling and the air inside them is taken out. Afterwards, fluid filling is performed. Since "water" is selected as the working fluid for the heat pipe, the calculated amount of demineralized boiler feed water will be used in the filling process. Wick materials made of stainless steel and having two different pore numbers (meshes) are placed in the pipes. Since both types of wicks were placed in the pipes in two layers, a total of 4-layer wick structure was obtained, with 120 mesh wicks in 2 layers and 200 mesh wicks in 2 layers, thus placing them in the pipes of the recuperator. [1], [2], [3], [4], [5], [6], [7], [8], [9], [10], [11], [12], [13], [14], [15], [16], [17], [18], [19], [20], [21], [22], [23], [24], [25], [26], [27], [28], [29], [30], [31], [32], [33], [37].

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2024-09-26
DOI
https://doi.org/10.5281/zenodo.13844846
Primary Topic
Mechanical and Thermal Properties Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Calculation of the Filling Amount of Working Fluid to be Placed in a Heat Pipe

Zenodo (CERN European Organization for Nuclear Research)
Mechanical and Thermal Properties Analysis
article

Calculation of the Filling Amount of Working Fluid to be Placed in a Heat Pipe

article en

Abstract

In this article, the working fluid to be placed in the Heat Pipes of a selected Heat Pipe Air Recuperator and the filling amount of this fluid will be determined by calculation. In the heat pipe air recuperator selected for calculations, there are a total of 18 heat pipes to be filled with working fluid. The amount of working fluid to be filled into each heat pipe is determined by calculation, and the inside of the pipes are put under vacuum before filling and the air inside them is taken out. Afterwards, fluid filling is performed. Since "water" is selected as the working fluid for the heat pipe, the calculated amount of demineralized boiler feed water will be used in the filling process. Wick materials made of stainless steel and having two different pore numbers (meshes) are placed in the pipes. Since both types of wicks were placed in the pipes in two layers, a total of 4-layer wick structure was obtained, with 120 mesh wicks in 2 layers and 200 mesh wicks in 2 layers, thus placing them in the pipes of the recuperator. [1], [2], [3], [4], [5], [6], [7], [8], [9], [10], [11], [12], [13], [14], [15], [16], [17], [18], [19], [20], [21], [22], [23], [24], [25], [26], [27], [28], [29], [30], [31], [32], [33], [37].

Zenodo (CERN European Organization for Nuclear Research)
TRW Automotive (United States) (US)
Openalex Percentile: Top 64%
Mechanical and Thermal Properties Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Calculation of the Filling Amount of Working Fluid to be Placed in a Heat Pipe · Zenodo (CERN European Organization for Nuclear Research) (2024) | TGRS Research Map | TGRS