Optimization configuration method of integrated energy system for reliability improvement of distribution network

As the scale of integrated energy system (IES) connected to the distribution network continues to expand, the influence of IES on the distribution network becomes more prominent. Therefore, there are limitations in planning methods that only consider the economy and reliability of IES. To solve this problem, this paper proposes a multi-objective optimization method of IES siting and equipment configuration considering the economy and reliability of distribution network. Firstly, considering the coupling interaction between IES and distribution network, the economy and reliability evaluation models of IES-distribution network combined system are constructed respectively. Then, based on the NSGA-Ⅱ (non-dominated sorting genetic agorithm Ⅱ) multi-objective optimization algorithm, the equipment capacity and access point location of IES are optimized with the objective of the economy and reliability of IES and distribution network respectively, and the optimal scheme under different planning scenarios is selected in Pareto solution set by utility function. Finally, an example is given to verify the effectiveness of the proposed method. Simulation results show that the proposed method can realize the cooperative optimization of IES and distribution network economy and reliability.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2025-05-01
DOI
https://doi.org/10.19753/j.issn1001-1390.2025.05.003
Primary Topic
Integrated Energy Systems Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization configuration method of integrated energy system for reliability improvement of distribution network

SHILAP Revista de lepidopterología
Integrated Energy Systems Optimization
article

Optimization configuration method of integrated energy system for reliability improvement of distribution network

article en

Abstract

As the scale of integrated energy system (IES) connected to the distribution network continues to expand, the influence of IES on the distribution network becomes more prominent. Therefore, there are limitations in planning methods that only consider the economy and reliability of IES. To solve this problem, this paper proposes a multi-objective optimization method of IES siting and equipment configuration considering the economy and reliability of distribution network. Firstly, considering the coupling interaction between IES and distribution network, the economy and reliability evaluation models of IES-distribution network combined system are constructed respectively. Then, based on the NSGA-Ⅱ (non-dominated sorting genetic agorithm Ⅱ) multi-objective optimization algorithm, the equipment capacity and access point location of IES are optimized with the objective of the economy and reliability of IES and distribution network respectively, and the optimal scheme under different planning scenarios is selected in Pareto solution set by utility function. Finally, an example is given to verify the effectiveness of the proposed method. Simulation results show that the proposed method can realize the cooperative optimization of IES and distribution network economy and reliability.

SHILAP Revista de lepidopterología
Electric Power Research Institute (US), Shanghai Electric (China) (CN)
Affordable and clean energy
Openalex Percentile: Top 55%
Integrated Energy Systems Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.