Progress of the spoke cavity prototyping for the JAEA-ADS linac

The Japan Atomic Energy Agency (JAEA) has been proposing an accelerator-driven nuclear transmutation system (ADS) as a future nuclear system. In preparation for the actual design of the CW proton linac for the JAEA-ADS, we are now prototyping a low-beta (around 0.2) single-spoke cavity. The cavity fabrication started in 2020. Most of the cavity parts were shaped in fiscal year 2020 by press-forming and machining. In 2021, we started welding the shaped cavity parts together. By preliminarily investigating the optimum welding conditions using mock-up test pieces, each cavity part was joined together with smooth welding beads. So far, we have fabricated the body section and the two end-plate sections. By measuring the resonant frequency of the temporarily assembled cavity, it was confirmed that there were no significant problems with the cavity fabrication.

Institutions

Publication Details

Journal
JACOW
Published
2024-10-25
DOI
https://doi.org/10.18429/jacow-linac2024-tupb078
Primary Topic
Particle accelerators and beam dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Progress of the spoke cavity prototyping for the JAEA-ADS linac

JACOW
Particle accelerators and beam dynamics
article

Progress of the spoke cavity prototyping for the JAEA-ADS linac

article en

Abstract

The Japan Atomic Energy Agency (JAEA) has been proposing an accelerator-driven nuclear transmutation system (ADS) as a future nuclear system. In preparation for the actual design of the CW proton linac for the JAEA-ADS, we are now prototyping a low-beta (around 0.2) single-spoke cavity. The cavity fabrication started in 2020. Most of the cavity parts were shaped in fiscal year 2020 by press-forming and machining. In 2021, we started welding the shaped cavity parts together. By preliminarily investigating the optimum welding conditions using mock-up test pieces, each cavity part was joined together with smooth welding beads. So far, we have fabricated the body section and the two end-plate sections. By measuring the resonant frequency of the temporarily assembled cavity, it was confirmed that there were no significant problems with the cavity fabrication.

JACOW
Japan Atomic Energy Agency (JP), High Energy Accelerator Research Organization (JP), Japan Proton Accelerator Research Complex (JP)
Affordable and clean energy
Openalex Percentile: Top 35%
Particle accelerators and beam dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.