Development of the superconducting HWR cavities for NICA project

Nuclotron-based Ion Collider fAcility (NICA) is an accelerator complex under construction in JINR, in which superconducting linac-injector can accelerate protons up to 20 MeV and light ions to 7.5 MeV/u. To achieve this design target, a 325 MHz, beta = 0.21 niobium half-wave resonator (HWR) called HWR1 was developed jointly by IMP and JINR. This paper optimizes the electromagnetic design of NICA cavity, designs the mechanical structure (including helium jacket) and gives the results of multi-physical studies. Simulation results show that Epk/Eacc = 6.29, the coefficients of df/dp and LFD are 4.96 Hz/mbar and -1.28 Hz/(MV/m)^2, respectively. In addition, the niobium cavity has been fabricated and vertically tested, the magnetic shield and helium jacket are in the process of electron beam welding, and the cryomodule will be assembled in the next 1~2 months.

Institutions

Publication Details

Journal
JACOW
Published
2024-10-25
DOI
https://doi.org/10.18429/jacow-linac2024-tupb050
Primary Topic
Particle accelerators and beam dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Development of the superconducting HWR cavities for NICA project

JACOW
Particle accelerators and beam dynamics
article

Development of the superconducting HWR cavities for NICA project

article en

Abstract

Nuclotron-based Ion Collider fAcility (NICA) is an accelerator complex under construction in JINR, in which superconducting linac-injector can accelerate protons up to 20 MeV and light ions to 7.5 MeV/u. To achieve this design target, a 325 MHz, beta = 0.21 niobium half-wave resonator (HWR) called HWR1 was developed jointly by IMP and JINR. This paper optimizes the electromagnetic design of NICA cavity, designs the mechanical structure (including helium jacket) and gives the results of multi-physical studies. Simulation results show that Epk/Eacc = 6.29, the coefficients of df/dp and LFD are 4.96 Hz/mbar and -1.28 Hz/(MV/m)^2, respectively. In addition, the niobium cavity has been fabricated and vertically tested, the magnetic shield and helium jacket are in the process of electron beam welding, and the cryomodule will be assembled in the next 1~2 months.

JACOW
Chinese Academy of Sciences (CN), Ji Hua Laboratory (CN), Institute of Modern Physics (CN), PRG S&Tech (South Korea)
Openalex Percentile: Top 35%
Particle accelerators and beam dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.