Research on Seamless Small-Radius Curved Track for Subway Upper Cover Property Depot External Lines

[Objective] To reduce vibration and noise impacts from depot train operation on the upper cover property, it is necessary to study the seamless design scheme for small-radius curved tracks on subway upper cover property depot external lines. [Method] The necessity of seamless design for depot external lines is introduced; the key parameters of small radius curved CWR(continuously welded rail) on depot external lines are analyzed. Based on CWR inspection verification principles, CWR inspection verification and optimization designs are conducted for external line curved section with a radius of 150 m. [Result & Conclusion] When 1 667 pieces of new type Ⅲ bridge sleepers per km are laid in the 150 m radius curved section of depot external lines, and the No. 7 CWR elastic bendable rail turnout is also laid, CWR laying requirements could be met. The optimal CWR design scheme for depot external lines is: adopting new type Ⅲ bridge sleepers for depot external lines, filling the gap spacing less than 5m between two lines with ballast, widening shoulder width of the outer curve track bed to 400mm, setting elevated ballast shoulders, and setting ballast embankment slope ratio to 1∶1.75. The proposed optimization scheme can enhance CWR stability and safety margin.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2025-05-01
DOI
https://doi.org/10.16037/j.1007-869x.2025.05.020
Primary Topic
Railway Engineering and Dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Seamless Small-Radius Curved Track for Subway Upper Cover Property Depot External Lines

SHILAP Revista de lepidopterología
Railway Engineering and Dynamics
article

Research on Seamless Small-Radius Curved Track for Subway Upper Cover Property Depot External Lines

article en

Abstract

[Objective] To reduce vibration and noise impacts from depot train operation on the upper cover property, it is necessary to study the seamless design scheme for small-radius curved tracks on subway upper cover property depot external lines. [Method] The necessity of seamless design for depot external lines is introduced; the key parameters of small radius curved CWR(continuously welded rail) on depot external lines are analyzed. Based on CWR inspection verification principles, CWR inspection verification and optimization designs are conducted for external line curved section with a radius of 150 m. [Result & Conclusion] When 1 667 pieces of new type Ⅲ bridge sleepers per km are laid in the 150 m radius curved section of depot external lines, and the No. 7 CWR elastic bendable rail turnout is also laid, CWR laying requirements could be met. The optimal CWR design scheme for depot external lines is: adopting new type Ⅲ bridge sleepers for depot external lines, filling the gap spacing less than 5m between two lines with ballast, widening shoulder width of the outer curve track bed to 400mm, setting elevated ballast shoulders, and setting ballast embankment slope ratio to 1∶1.75. The proposed optimization scheme can enhance CWR stability and safety margin.

SHILAP Revista de lepidopterología
Xi'an Railway Survey and Design Institute (CN)
Sustainable cities and communities
Openalex Percentile: Top 55%
Railway Engineering and Dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.