Comprehensive Construction Method for Shield Receiving in Water-rich Silty Sand Stratum

[Objective]To address the issue of cutterhead damage and subsequent work stoppages caused by unidentified obstructions during the construction of Zhengzhou Metro Line 3 tunnel, it is essential to study comprehensive construction methods for shield receiving in water-rich silty sand stratum. [Method]A comprehensive construction plan for shield receiving is introduced, incorporating techniques such as the double-ring freezing method, active dewatering, mining methods, and shield empty push construction. The temperature variation characteristics of freezing and key construction technologies are analyzed using on-site monitoring data. [Result & Conclusion]The comprehensive construction plan is proven to be safe and effective for dealing with shield receiving in water-rich silty sand stratum conditions. Adopting double-ring freezing method combined with active dewatering could effectively prevent issues related to water and sand inflows in mining method tunnels. During the steam thawing process of the inner ring freezing wall, the temperature of the outer ring freezing wall increases by approximately 5 ℃. When employing the shield empty push method through a mining method tunnel that is not fully thawed, the maximum shield thrust is 26 500 kN, which is less than the theoretical value of shield push resistance. At this point, the ground displacement and tunnel deformation all meet control requirements. During shield empty pushing, the temperature at the interface between shield casing and partially thawed inner ring soil remains around 3 ℃. When crossing the frozen zone using the mining method, different levels of land subsidence are observed near the tunnel, while the soil layer subsidence trend far away from the tunnel remains relatively stable.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2024-12-01
DOI
https://doi.org/10.16037/j.1007-869x.2024.12.026
Primary Topic
Climate change and permafrost
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Comprehensive Construction Method for Shield Receiving in Water-rich Silty Sand Stratum

SHILAP Revista de lepidopterología
Climate change and permafrost
article

Comprehensive Construction Method for Shield Receiving in Water-rich Silty Sand Stratum

article en

Abstract

[Objective]To address the issue of cutterhead damage and subsequent work stoppages caused by unidentified obstructions during the construction of Zhengzhou Metro Line 3 tunnel, it is essential to study comprehensive construction methods for shield receiving in water-rich silty sand stratum. [Method]A comprehensive construction plan for shield receiving is introduced, incorporating techniques such as the double-ring freezing method, active dewatering, mining methods, and shield empty push construction. The temperature variation characteristics of freezing and key construction technologies are analyzed using on-site monitoring data. [Result & Conclusion]The comprehensive construction plan is proven to be safe and effective for dealing with shield receiving in water-rich silty sand stratum conditions. Adopting double-ring freezing method combined with active dewatering could effectively prevent issues related to water and sand inflows in mining method tunnels. During the steam thawing process of the inner ring freezing wall, the temperature of the outer ring freezing wall increases by approximately 5 ℃. When employing the shield empty push method through a mining method tunnel that is not fully thawed, the maximum shield thrust is 26 500 kN, which is less than the theoretical value of shield push resistance. At this point, the ground displacement and tunnel deformation all meet control requirements. During shield empty pushing, the temperature at the interface between shield casing and partially thawed inner ring soil remains around 3 ℃. When crossing the frozen zone using the mining method, different levels of land subsidence are observed near the tunnel, while the soil layer subsidence trend far away from the tunnel remains relatively stable.

SHILAP Revista de lepidopterología
Zhejiang Sci-Tech University (CN), CRRC (China) (CN), Shanghai Construction Group (China) (CN)
Sustainable cities and communities
Openalex Percentile: Top 64%
Climate change and permafrost
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.