Practice of Defect Reconstruction in Embedded Rail Jointed Track on Large-span Steel Truss Bridge Ends

[Objective] To address the fractured joint bolt issues of embedded rail jointed tracks on large-span steel truss bridge ends, it is necessary to analyze the causes of the defects, design treatment plans, and explore reconstruction measures under non-disruptive operating conditions. [Method] Field investigations are conducted to collect data on fractured joint bolts and the variations in rail joint gaps with temperature changes, enabling a preliminary qualitative analysis. A finite element model of the interaction between bridge girder and rails is developed for theoretical calculations, to analyze the stress and displacement of the rails and verify the bolt strength. Based on the analysis results and reconstruction requirements, an engineering reconstruction plan is designed. [Result & Conclusion] As the expansion displacement of large-span steel truss bridges increases, the rail joint gaps in jointed tracks cannot accommodate the displacement of the bridge ends, leading to frequent bolt fractures near the bridge ends. By installing rail expansion regulators, the displacement between bridge and rails can be effectively mitigated. The rail expansion regulators should be installed in a straight configuration, positioned near the bridge ends, and a specially designed prefabricated regulator should be adopted to avoid secondary assembly on-site, ensuring structural stability and restoring the bridge deck. Rapid construction can be achieved by locally removing the ballast bed, drilling holes, and grouting fast-setting high-strength mortar under large steel plates. Approximately half of the available reconstruction window is used for track bed partial removal and drilling, enabling the completion of the main single-side rail expansion regulator installation within one operational window period.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2025-03-01
DOI
https://doi.org/10.16037/j.1007-869x.2025.03.053
Primary Topic
Civil and Geotechnical Engineering Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Practice of Defect Reconstruction in Embedded Rail Jointed Track on Large-span Steel Truss Bridge Ends

SHILAP Revista de lepidopterología
Civil and Geotechnical Engineering Research
article

Practice of Defect Reconstruction in Embedded Rail Jointed Track on Large-span Steel Truss Bridge Ends

article en

Abstract

[Objective] To address the fractured joint bolt issues of embedded rail jointed tracks on large-span steel truss bridge ends, it is necessary to analyze the causes of the defects, design treatment plans, and explore reconstruction measures under non-disruptive operating conditions. [Method] Field investigations are conducted to collect data on fractured joint bolts and the variations in rail joint gaps with temperature changes, enabling a preliminary qualitative analysis. A finite element model of the interaction between bridge girder and rails is developed for theoretical calculations, to analyze the stress and displacement of the rails and verify the bolt strength. Based on the analysis results and reconstruction requirements, an engineering reconstruction plan is designed. [Result & Conclusion] As the expansion displacement of large-span steel truss bridges increases, the rail joint gaps in jointed tracks cannot accommodate the displacement of the bridge ends, leading to frequent bolt fractures near the bridge ends. By installing rail expansion regulators, the displacement between bridge and rails can be effectively mitigated. The rail expansion regulators should be installed in a straight configuration, positioned near the bridge ends, and a specially designed prefabricated regulator should be adopted to avoid secondary assembly on-site, ensuring structural stability and restoring the bridge deck. Rapid construction can be achieved by locally removing the ballast bed, drilling holes, and grouting fast-setting high-strength mortar under large steel plates. Approximately half of the available reconstruction window is used for track bed partial removal and drilling, enabling the completion of the main single-side rail expansion regulator installation within one operational window period.

SHILAP Revista de lepidopterología
Shanghai Urban Construction Design and Research Institute (Group) (CN)
Sustainable cities and communities
Openalex Percentile: Top 30%
Civil and Geotechnical Engineering Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.