Design and Build of Paks Danube Bridge, Hungary

The role of general and lead designer of the recently inaugurated Paks-Kalocsa Danube Bridge in Hungary was undertaken by CÉH Zrt. The total length of the bridge is 946 m, of which the length of the extradosed river bridge is 440 m. Span arrangement of the extradosed river bridge is 119+200+119 m and the deck width is 20.86 m. The parabolically haunched stiffening girder is a composite dual cell box section comprised of corrugated steel webs and post tensioned in-situ rc. concrete bottom and top slabs. The extradosed river bridge superstructure was erected by the balanced cantilever method. In the presentation, superstructure camber control is presented on the below structural members: - bespoke designed cable anchorage steel link members at rc. pylon heads - general stiffening girder sections - stiffening girder section with cast-in extradosed cable anchorage members Regarding the pylon structure, the camber control of pylon formwork will be presented for each casting phase, the installation and adjustment of bespoke designed link members, as well as the spatial angle settings of cable anchorage plates. The comparison of proprietary saddle elements with the bespoke designed link member will be presented as well. In the presentation the vertical and horizontal camber setting routine will be explored for the general stiffening girder section. For the deck section with extradosed anchorage members, the site measurement and setting routine of the centreline of cable anchorage tubes along with optional adjustment of anchorage support plates will be presented. The presentation will explore the correction adjustment of the steel protective tubes that are cast-in the top deck plate with a shim plate rings to ensure the installation of the extradosed cables in later construction phases. In the presentation we discuss the designer’s data provision, geodetic measurement, site adjustment sequence and we provide the statement of quantities for the measurement points.

Publication Details

Journal
mediaTUM (Technical University of Munich)
Published
2024-11-20
DOI
https://doi.org/10.14459/icbdb24.06
Primary Topic
Structural Engineering and Vibration Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Design and Build of Paks Danube Bridge, Hungary

mediaTUM (Technical University of Munich)
Structural Engineering and Vibration Analysis
article

Design and Build of Paks Danube Bridge, Hungary

article en

Abstract

The role of general and lead designer of the recently inaugurated Paks-Kalocsa Danube Bridge in Hungary was undertaken by CÉH Zrt. The total length of the bridge is 946 m, of which the length of the extradosed river bridge is 440 m. Span arrangement of the extradosed river bridge is 119+200+119 m and the deck width is 20.86 m. The parabolically haunched stiffening girder is a composite dual cell box section comprised of corrugated steel webs and post tensioned in-situ rc. concrete bottom and top slabs. The extradosed river bridge superstructure was erected by the balanced cantilever method. In the presentation, superstructure camber control is presented on the below structural members: - bespoke designed cable anchorage steel link members at rc. pylon heads - general stiffening girder sections - stiffening girder section with cast-in extradosed cable anchorage members Regarding the pylon structure, the camber control of pylon formwork will be presented for each casting phase, the installation and adjustment of bespoke designed link members, as well as the spatial angle settings of cable anchorage plates. The comparison of proprietary saddle elements with the bespoke designed link member will be presented as well. In the presentation the vertical and horizontal camber setting routine will be explored for the general stiffening girder section. For the deck section with extradosed anchorage members, the site measurement and setting routine of the centreline of cable anchorage tubes along with optional adjustment of anchorage support plates will be presented. The presentation will explore the correction adjustment of the steel protective tubes that are cast-in the top deck plate with a shim plate rings to ensure the installation of the extradosed cables in later construction phases. In the presentation we discuss the designer’s data provision, geodetic measurement, site adjustment sequence and we provide the statement of quantities for the measurement points.

mediaTUM (Technical University of Munich)
Sustainable cities and communities
Openalex Percentile: Top 60%
Structural Engineering and Vibration Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Design and Build of Paks Danube Bridge, Hungary · mediaTUM (Technical University of Munich) (2024) | TGRS Research Map | TGRS