As can be seen from several other executed projects, almost all major infrastructure projects in Germany usually extend over many years, from work stage 1, strategic and project definition, to work stage 9, project end. On the railway line 5600 between Munich East and Mühldorf am Inn, the Schwillach embankment in planning approval section 1.2, with the two engineering structures, EÜ Dorfstraße and EÜ Schwillach, is one of the largest earth structures and thus forms the Achilles tendon in German Railway major project “ABS 38” in southern Germany. In this article, we report on the manifold engineering challenges of the design planning of an object, across all stages, how the optimal solution cannot be found directly at the beginning of a project in work stage 2, preliminary planning, but can only be found during the design planning through iterative steps and different influences, dependencies and boundary conditions. Maintaining train operation or building under rolling wheels is particularly important for a single-track railway line, which can make planning and execution even more complicated.

Publication Details

Journal
mediaTUM (Technical University of Munich)
Published
2024-11-20
DOI
https://doi.org/10.14459/icbdb24.20
Primary Topic
Civil and Structural Engineering Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Large Infrastructure Projects – The Challenging Road to an Optimal Design

mediaTUM (Technical University of Munich)
Civil and Structural Engineering Research
article

Large Infrastructure Projects – The Challenging Road to an Optimal Design

article en

Abstract

As can be seen from several other executed projects, almost all major infrastructure projects in Germany usually extend over many years, from work stage 1, strategic and project definition, to work stage 9, project end. On the railway line 5600 between Munich East and Mühldorf am Inn, the Schwillach embankment in planning approval section 1.2, with the two engineering structures, EÜ Dorfstraße and EÜ Schwillach, is one of the largest earth structures and thus forms the Achilles tendon in German Railway major project “ABS 38” in southern Germany. In this article, we report on the manifold engineering challenges of the design planning of an object, across all stages, how the optimal solution cannot be found directly at the beginning of a project in work stage 2, preliminary planning, but can only be found during the design planning through iterative steps and different influences, dependencies and boundary conditions. Maintaining train operation or building under rolling wheels is particularly important for a single-track railway line, which can make planning and execution even more complicated.

mediaTUM (Technical University of Munich)
Industry, innovation and infrastructure
Openalex Percentile: Top 60%
Civil and Structural Engineering Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Large Infrastructure Projects – The Challenging Road to an Optimal Design · mediaTUM (Technical University of Munich) (2024) | TGRS Research Map | TGRS