The New Bechlingen Viaduct in the Course of the Motorway A 45

Due to deficits identified during the recalculation of the Bechlingen viaduct on the A 45 the two substructures of the existing arch bridge had to be replaced by a new construction. For this purpose, the existing bridge structure was dismantled with the help of a demolition scaffolding. The new bridge structure consists of a geometrically complex three-span continuous girder system in prestressed concrete construction with two separate superstructures. The very wide cross-section required in the course of the six-lane expansion is designed as a two-cell prestressed concrete box girder with internal and external prestressing. Due to the section-by-section production on a scaffolding which was ground supported or suspended from the joints and the concreting of the cross-section in four sections, the interaction between the structure and shoring with regard to the load-bearing behavior had to be investigated in detail. This contribution deals with special features of the design and construction of the new bridge structure as well as the demolition of the existing bridge.

Publication Details

Journal
mediaTUM (Technical University of Munich)
Published
2024-11-20
DOI
https://doi.org/10.14459/icbdb24.32
Primary Topic
Mycorrhizal Fungi and Plant Interactions
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The New Bechlingen Viaduct in the Course of the Motorway A 45

mediaTUM (Technical University of Munich)
Mycorrhizal Fungi and Plant Interactions
article

The New Bechlingen Viaduct in the Course of the Motorway A 45

article en

Abstract

Due to deficits identified during the recalculation of the Bechlingen viaduct on the A 45 the two substructures of the existing arch bridge had to be replaced by a new construction. For this purpose, the existing bridge structure was dismantled with the help of a demolition scaffolding. The new bridge structure consists of a geometrically complex three-span continuous girder system in prestressed concrete construction with two separate superstructures. The very wide cross-section required in the course of the six-lane expansion is designed as a two-cell prestressed concrete box girder with internal and external prestressing. Due to the section-by-section production on a scaffolding which was ground supported or suspended from the joints and the concreting of the cross-section in four sections, the interaction between the structure and shoring with regard to the load-bearing behavior had to be investigated in detail. This contribution deals with special features of the design and construction of the new bridge structure as well as the demolition of the existing bridge.

mediaTUM (Technical University of Munich)
Sustainable cities and communities
Openalex Percentile: Top 45%
Mycorrhizal Fungi and Plant Interactions
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.