Design and Construction of Bridges on Morava Corridor

Morava Corridor Motorway Project is a 112 km dual-carriageway motorway currently under construction in Serbia, with a design speed of 130 km/h, from Pojate and the A1 (the North-South motorway in central Serbia) through Kruševac and up into Preljina in the north of Čačak. The project runs east/west in the West Morava River valley and is seen as a key enabler of the economic corridor to the industrial city of Kruševac and its ultimate international connections to Bosnia, Montenegro and Macedonia. It consists of 78 bridges, 26 overpasses, and 11 underpasses. With the length of the motorway and the number of structures currently under construction, this is one of the largest construction projects currently in Serbia. In this paper, experiences during design and construction of these bridges has been presented. First, design approaches (such as strut-and-tie method for design of pile caps and pier caps) has been discussed, and construction aspects of the project have been reviewed. The motorway is located in seismically active region, with peak ground acceleration up to 0.2g. Precast construction was used for the majority of structures, which enable fast and efficient construction. Pretensioning of the concrete beams has been applied on almost all bridges, which is the type of the prestressing extremely rare in Serbia, where posttensioning is always used in bridge construction. By pretensioning, large number of beams were produced in timely manner and in controlled environment. Also, the eight longest bridges, with a total length of more than 3.3 km, are seismically isolated, which is one of the first uses of seismic isolation in Serbia. These bridge are the first bridges in Serbia which are in the same time seismically isolated and pretensioned. Seismic isolation provided large savings for the substructure reinforcement demand, while limiting the expansion segment length to about 200m.

Publication Details

Journal
mediaTUM (Technical University of Munich)
Published
2024-11-20
DOI
https://doi.org/10.14459/icbdb24.11
Primary Topic
Mycorrhizal Fungi and Plant Interactions
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Design and Construction of Bridges on Morava Corridor

mediaTUM (Technical University of Munich)
Mycorrhizal Fungi and Plant Interactions
article

Design and Construction of Bridges on Morava Corridor

article en

Abstract

Morava Corridor Motorway Project is a 112 km dual-carriageway motorway currently under construction in Serbia, with a design speed of 130 km/h, from Pojate and the A1 (the North-South motorway in central Serbia) through Kruševac and up into Preljina in the north of Čačak. The project runs east/west in the West Morava River valley and is seen as a key enabler of the economic corridor to the industrial city of Kruševac and its ultimate international connections to Bosnia, Montenegro and Macedonia. It consists of 78 bridges, 26 overpasses, and 11 underpasses. With the length of the motorway and the number of structures currently under construction, this is one of the largest construction projects currently in Serbia. In this paper, experiences during design and construction of these bridges has been presented. First, design approaches (such as strut-and-tie method for design of pile caps and pier caps) has been discussed, and construction aspects of the project have been reviewed. The motorway is located in seismically active region, with peak ground acceleration up to 0.2g. Precast construction was used for the majority of structures, which enable fast and efficient construction. Pretensioning of the concrete beams has been applied on almost all bridges, which is the type of the prestressing extremely rare in Serbia, where posttensioning is always used in bridge construction. By pretensioning, large number of beams were produced in timely manner and in controlled environment. Also, the eight longest bridges, with a total length of more than 3.3 km, are seismically isolated, which is one of the first uses of seismic isolation in Serbia. These bridge are the first bridges in Serbia which are in the same time seismically isolated and pretensioned. Seismic isolation provided large savings for the substructure reinforcement demand, while limiting the expansion segment length to about 200m.

mediaTUM (Technical University of Munich)
Sustainable cities and communities
Openalex Percentile: Top 46%
Mycorrhizal Fungi and Plant Interactions
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.