Reconstruction of the Southern Connecting Railway Bridge in Budapest

The Southern connecting railway bridge is Hungary's most important and busiest railway link on the river Danube, in the centre of Budapest. The condition of the existing old superstructure required its reconstruction. The reconstruction had to be carried out in such a way as to maintain double-track rail traffic while the bridges were being rebuilt. The reconstruction involved building a new superstructure, transferring traffic to the new bridge and demolishing an old bridge. The operation was repeated once again and then the third bridge was built. To accommodate the superstructures, we had to reconfigure and raise the existing pillars. The steel structures were fabricated in our own plant and prefabricated in a local port in 80-metre long and 500-tonnes pieces. The bridge elements were floated to the site, where they were lifted by two floating cranes onto a self-developed heavy lifting system. It consisted of 4 to 4 lifting towers mounted on 2 barges of 52 m length, on which the floating units were positioned perpendicular to the longitudinal axis of the barges. The floating units were lifted onto the scaffolds and were moved to the lower lifting level by 2 pushers to the lifting position, where they were lifted to the height of the pushing plane by the lifting platform. Subsequently, the bridge was pushed into position according to the site-plan. The pushing operations were complicated by the fact that the adjacent bridges were within the distance of half a metre. After closing the bridge steel structure, the railway track was placed, a test load was applied and the railway traffic started. The demolition of the two old bridges and the construction of the three new railway bridges took a total of 36 months to plan and build.

Publication Details

Journal
mediaTUM (Technical University of Munich)
Published
2024-11-20
DOI
https://doi.org/10.14459/icbdb24.25
Primary Topic
Mycorrhizal Fungi and Plant Interactions
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Reconstruction of the Southern Connecting Railway Bridge in Budapest

mediaTUM (Technical University of Munich)
Mycorrhizal Fungi and Plant Interactions
article

Reconstruction of the Southern Connecting Railway Bridge in Budapest

article en

Abstract

The Southern connecting railway bridge is Hungary's most important and busiest railway link on the river Danube, in the centre of Budapest. The condition of the existing old superstructure required its reconstruction. The reconstruction had to be carried out in such a way as to maintain double-track rail traffic while the bridges were being rebuilt. The reconstruction involved building a new superstructure, transferring traffic to the new bridge and demolishing an old bridge. The operation was repeated once again and then the third bridge was built. To accommodate the superstructures, we had to reconfigure and raise the existing pillars. The steel structures were fabricated in our own plant and prefabricated in a local port in 80-metre long and 500-tonnes pieces. The bridge elements were floated to the site, where they were lifted by two floating cranes onto a self-developed heavy lifting system. It consisted of 4 to 4 lifting towers mounted on 2 barges of 52 m length, on which the floating units were positioned perpendicular to the longitudinal axis of the barges. The floating units were lifted onto the scaffolds and were moved to the lower lifting level by 2 pushers to the lifting position, where they were lifted to the height of the pushing plane by the lifting platform. Subsequently, the bridge was pushed into position according to the site-plan. The pushing operations were complicated by the fact that the adjacent bridges were within the distance of half a metre. After closing the bridge steel structure, the railway track was placed, a test load was applied and the railway traffic started. The demolition of the two old bridges and the construction of the three new railway bridges took a total of 36 months to plan and build.

mediaTUM (Technical University of Munich)
Sustainable cities and communities
Openalex Percentile: Top 47%
Mycorrhizal Fungi and Plant Interactions
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Reconstruction of the Southern Connecting Railway Bridge in Budapest · mediaTUM (Technical University of Munich) (2024) | TGRS Research Map | TGRS