Normally closed blowout prevention system and method for underground drilling construction in coal mine

In view of the problems of gas overrun and coal and gas outburst accidents in the construction of underground gas extraction boreholes in coal mines, the problems existing in the traditional simple orifice device and the normally open automatic orifice prevention system were analyzed, and the normally closed blowout prevention system and method were proposed, which could be integrated with the drilling rig body to meet the needs of various special-shaped roadway orifice sealing, slag discharge and gas extraction. At the same time, the control system can be linked with the hydraulic control system of the drilling machine to realize the automatic closing of the pressure relief of the blowout prevention system at the orifice to prevent the leakage of gas in the hole. Compared with the traditional and existing orifice blowout prevention systems, the blowout prevention system is simple and clear, has stronger adaptability to the drilling rig, significantly improves the effect of drilling blowout prevention and treatment, and significantly reduces the labor intensity of workers, which can provide a favorable guarantee for the safety and efficiency of underground gas extraction drilling construction.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2024-09-01
DOI
https://doi.org/10.13347/j.cnki.mkaq.20231431
Primary Topic
Mycorrhizal Fungi and Plant Interactions
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Normally closed blowout prevention system and method for underground drilling construction in coal mine

SHILAP Revista de lepidopterología
Mycorrhizal Fungi and Plant Interactions
article

Normally closed blowout prevention system and method for underground drilling construction in coal mine

article en

Abstract

In view of the problems of gas overrun and coal and gas outburst accidents in the construction of underground gas extraction boreholes in coal mines, the problems existing in the traditional simple orifice device and the normally open automatic orifice prevention system were analyzed, and the normally closed blowout prevention system and method were proposed, which could be integrated with the drilling rig body to meet the needs of various special-shaped roadway orifice sealing, slag discharge and gas extraction. At the same time, the control system can be linked with the hydraulic control system of the drilling machine to realize the automatic closing of the pressure relief of the blowout prevention system at the orifice to prevent the leakage of gas in the hole. Compared with the traditional and existing orifice blowout prevention systems, the blowout prevention system is simple and clear, has stronger adaptability to the drilling rig, significantly improves the effect of drilling blowout prevention and treatment, and significantly reduces the labor intensity of workers, which can provide a favorable guarantee for the safety and efficiency of underground gas extraction drilling construction.

SHILAP Revista de lepidopterología
Huaibei Mining (China) (CN), China Coal Technology and Engineering Group Corp (China) (CN)
Openalex Percentile: Top 48%
Mycorrhizal Fungi and Plant Interactions
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Normally closed blowout prevention system and method for underground drilling construction in coal mine · SHILAP Revista de lepidopterología (2024) | TGRS Research Map | TGRS