On Reliability of 110-500 kV GIS: Operational Experience

\nThe accident rate of gas-insulated switchgears (GIS) is considered. The statistical sample covered 30 110-500 kV switchgear switchgears in a vast region of the European part of the country for the period 2008-2022. Their design features and technical characteristics are given. Significant and insignificant failures of GIS, including their structure, namely, distribution by elements of installations, technical and organizational causes of occurrence, dependence on the year of operation are subjected to analysis. The flow parameter (frequency) of GIS failures is determined, as well as the maximum possible time of GIS restoration after damage to the arc suppression chamber of the pole of the 500 kV circuit breaker. Comparative data are given with failure rate of GIS abroad and with gas-insulated circuit breaker cells in open switchgears.\n

Publication Details

Journal
Springer Link (Chiba Institute of Technology)
Published
2024-11-06
DOI
https://doi.org/10.1051/e3sconf/202458401018/pdf
Primary Topic
Mycorrhizal Fungi and Plant Interactions
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

On Reliability of 110-500 kV GIS: Operational Experience

Springer Link (Chiba Institute of Technology)
Mycorrhizal Fungi and Plant Interactions
article

On Reliability of 110-500 kV GIS: Operational Experience

article en

Abstract

\nThe accident rate of gas-insulated switchgears (GIS) is considered. The statistical sample covered 30 110-500 kV switchgear switchgears in a vast region of the European part of the country for the period 2008-2022. Their design features and technical characteristics are given. Significant and insignificant failures of GIS, including their structure, namely, distribution by elements of installations, technical and organizational causes of occurrence, dependence on the year of operation are subjected to analysis. The flow parameter (frequency) of GIS failures is determined, as well as the maximum possible time of GIS restoration after damage to the arc suppression chamber of the pole of the 500 kV circuit breaker. Comparative data are given with failure rate of GIS abroad and with gas-insulated circuit breaker cells in open switchgears.\n

Springer Link (Chiba Institute of Technology)
Good health and well-being
Openalex Percentile: Top 61%
Mycorrhizal Fungi and Plant Interactions
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.