Factors impacting construction cost of high-rise building in India

The construction of high-rise buildings in India is a critical aspect of urban development, driven by rapid urbanization, population growth, and the increasing demand for residential and commercial spaces. However, the cost of constructing these towering structures remains a significant challenge, influenced by a multifaceted set of factors. Understanding these determinants is essential for effective project planning, cost control, and sustainable development. High-rise construction is a complex and resource-intensive process influenced by numerous cost-driving factors, particularly in a dynamic and diverse economy like India. This research aims to identify, analyze, and quantify the primary factors impacting the construction cost of high-rise buildings in India. An extensive literature review identified 24 critical factors, including vertical transportation of materials, structural requirements, services installation (e.g., MEP, HVAC, fire protection), labor safety, equipment usage, and geographical considerations, among others. A two-tier methodology was employed: first, expert surveys were conducted to refine and prioritize the factors, narrowing them down to 10 key determinants. Subsequently, a detailed expert questionnaire assessed the cost weightage of these factors in the overall project budget. The study also explores indirect costs, such as insurance cost, supervision cost, legal and regulatory compliance which significantly influence project expenditures. Findings from this research provide a comprehensive understanding of the cost dynamics in high-rise construction projects, offering valuable insights for project managers, contractors, and policymakers to optimize resource allocation, improve cost forecasting, and enhance decision-making in the Indian construction sector.

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2025-05-09
DOI
https://doi.org/10.5281/zenodo.15369702
Primary Topic
Pregnancy and preeclampsia studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Factors impacting construction cost of high-rise building in India

Zenodo (CERN European Organization for Nuclear Research)
Pregnancy and preeclampsia studies
article

Factors impacting construction cost of high-rise building in India

article en

Abstract

The construction of high-rise buildings in India is a critical aspect of urban development, driven by rapid urbanization, population growth, and the increasing demand for residential and commercial spaces. However, the cost of constructing these towering structures remains a significant challenge, influenced by a multifaceted set of factors. Understanding these determinants is essential for effective project planning, cost control, and sustainable development. High-rise construction is a complex and resource-intensive process influenced by numerous cost-driving factors, particularly in a dynamic and diverse economy like India. This research aims to identify, analyze, and quantify the primary factors impacting the construction cost of high-rise buildings in India. An extensive literature review identified 24 critical factors, including vertical transportation of materials, structural requirements, services installation (e.g., MEP, HVAC, fire protection), labor safety, equipment usage, and geographical considerations, among others. A two-tier methodology was employed: first, expert surveys were conducted to refine and prioritize the factors, narrowing them down to 10 key determinants. Subsequently, a detailed expert questionnaire assessed the cost weightage of these factors in the overall project budget. The study also explores indirect costs, such as insurance cost, supervision cost, legal and regulatory compliance which significantly influence project expenditures. Findings from this research provide a comprehensive understanding of the cost dynamics in high-rise construction projects, offering valuable insights for project managers, contractors, and policymakers to optimize resource allocation, improve cost forecasting, and enhance decision-making in the Indian construction sector.

Zenodo (CERN European Organization for Nuclear Research)
Sustainable cities and communities
Openalex Percentile: Top 43%
Pregnancy and preeclampsia studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Factors impacting construction cost of high-rise building in India · Zenodo (CERN European Organization for Nuclear Research) (2025) | TGRS Research Map | TGRS