Analysis of Construction Worker Group Productivity at Pt. Bima Natisa Graha Contractor for Red Brick Installation Work with Time Study Method on Housing Development Project

This study aims to determine the productivity value of construction workers of PT Bima Natisa Graha red brick installation work on the construction project of housing units in residential area projects, to determine the factors that hinder the productivity of construction workers for red brick installation and to determine the productivity value of construction workers in red brick installation work after improving the factors that hinder the productivity of construction workers in red brick installation. The method to measure the productivity of construction workers in the installation of red bricks with the time study method. Time study is a method of measuring labor productivity in the field by determining the standard time of a job. The results of the study can be concluded as follows: (1) The productivity value of construction workers for red brick installation work on a housing construction project implemented by the contractor PT Bima Natisa Graha on a type 60 housing unit with a time study method of 0.378 M2 / OJ (2) Factors that hinder the productivity of construction workers are site managers, implementers and foremen from PT. Bima Natisa Graha who is rarely seen at the project site which should be in charge of giving directions in carrying out work in the field to workers so that workers joke more, talk a lot, smoke a lot, play a lot of cellphones and have coffee during working hours, this condition occurs because there is no reprimand and direction from the authorities. (3) The productivity value of construction workers for red brick installation work on a housing construction project carried out by the contractor PT Bima Natisa Graha on a type 60 housing unit with the time study method after productivity improvement is 0.496 M2 / OJ.

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2024-09-20
DOI
https://doi.org/10.5281/zenodo.13809334
Primary Topic
Machine Learning in Bioinformatics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Construction Worker Group Productivity at Pt. Bima Natisa Graha Contractor for Red Brick Installation Work with Time Study Method on Housing Development Project

Zenodo (CERN European Organization for Nuclear Research)
Machine Learning in Bioinformatics
article

Analysis of Construction Worker Group Productivity at Pt. Bima Natisa Graha Contractor for Red Brick Installation Work with Time Study Method on Housing Development Project

article en

Abstract

This study aims to determine the productivity value of construction workers of PT Bima Natisa Graha red brick installation work on the construction project of housing units in residential area projects, to determine the factors that hinder the productivity of construction workers for red brick installation and to determine the productivity value of construction workers in red brick installation work after improving the factors that hinder the productivity of construction workers in red brick installation. The method to measure the productivity of construction workers in the installation of red bricks with the time study method. Time study is a method of measuring labor productivity in the field by determining the standard time of a job. The results of the study can be concluded as follows: (1) The productivity value of construction workers for red brick installation work on a housing construction project implemented by the contractor PT Bima Natisa Graha on a type 60 housing unit with a time study method of 0.378 M2 / OJ (2) Factors that hinder the productivity of construction workers are site managers, implementers and foremen from PT. Bima Natisa Graha who is rarely seen at the project site which should be in charge of giving directions in carrying out work in the field to workers so that workers joke more, talk a lot, smoke a lot, play a lot of cellphones and have coffee during working hours, this condition occurs because there is no reprimand and direction from the authorities. (3) The productivity value of construction workers for red brick installation work on a housing construction project carried out by the contractor PT Bima Natisa Graha on a type 60 housing unit with the time study method after productivity improvement is 0.496 M2 / OJ.

Zenodo (CERN European Organization for Nuclear Research)
Universitas Pamulang (ID)
Decent work and economic growth
Openalex Percentile: Top 62%
Machine Learning in Bioinformatics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis of Construction Worker Group Productivity at Pt. Bima Natisa Graha Contractor for Red Brick Installation Work with Time Study Method on Housing Development Project · Zenodo (CERN European Organization for Nuclear Research) (2024) | TGRS Research Map | TGRS