D5.3.1 Regulatory inputs to international bodies
This report summarises the dissemination activities conducted for Work Package (WP) 5 of the EverLoNG project. The EverLoNG project set out to develop and demonstrate the SBCC technology. For this, they installed a demonstrator onboard the Seapeak Arwa LNG Carrier (chartered by TotalEnergies) and the SSCV Sleipnir. The demonstrator’s operational risks were assessed in a HAZOP workshop. Full-scale concept designs were further developed for a new build LNG Carrier and the SSCV Sleipnir based on the same technology and working principles and assessed in dedicated HAZID workshops. The objective of Task 5.3 was to publish and disseminate the knowledge gained through these risk workshops amongst the wider maritime community, thereby accelerating the uptake of SBCC in a safe and certifiable manner.
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2025-03-27
- DOI
- https://doi.org/10.5281/zenodo.15100379
- Primary Topic
- Forensic and Genetic Research
- Type
- article
- Field-Weighted Citation Impact
- 0.00