STUDY OF THE METHODOLOGICAL BASIS OF OPTIMIZATION OF THE GEODESIC NETWORK IN THE TERRITORY OF THE MURUNTOV QUARRY INDUSTRIAL ZONE

Insufficient availability of geodetic networks with known coordinates around mining facilities has a significant impact on mining facilities, conducting geodetic measurements and geodetic surveys, improving the quality of work and testing measuring instruments. With this in mind, the information on the determination of geodetic network in the Zarmitan and Muruntau mining is provided by the Leica GS10 GNSS satellite receivers of navigation systems. The influence of the external environment on the accuracy of the planned and height coordinates obtained from the observations and the duration of the navigational measurements have taken into account and the analysis was carried out. Planning and height precision indicators (HDOP, VDOP, PDOP, TDOP) are detailed. The graphs of coordinates change depending on several cycles of GNSS measurements are also given. It is recommended that you perform repeated GNSS measurements at different points of the year, with long intervals at established checkpoints.

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2024-12-18
DOI
https://doi.org/10.5281/zenodo.14512710
Primary Topic
Geodetic Measurements and Engineering Structures
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

STUDY OF THE METHODOLOGICAL BASIS OF OPTIMIZATION OF THE GEODESIC NETWORK IN THE TERRITORY OF THE MURUNTOV QUARRY INDUSTRIAL ZONE

Zenodo (CERN European Organization for Nuclear Research)
Geodetic Measurements and Engineering Structures
article

STUDY OF THE METHODOLOGICAL BASIS OF OPTIMIZATION OF THE GEODESIC NETWORK IN THE TERRITORY OF THE MURUNTOV QUARRY INDUSTRIAL ZONE

article en

Abstract

Insufficient availability of geodetic networks with known coordinates around mining facilities has a significant impact on mining facilities, conducting geodetic measurements and geodetic surveys, improving the quality of work and testing measuring instruments. With this in mind, the information on the determination of geodetic network in the Zarmitan and Muruntau mining is provided by the Leica GS10 GNSS satellite receivers of navigation systems. The influence of the external environment on the accuracy of the planned and height coordinates obtained from the observations and the duration of the navigational measurements have taken into account and the analysis was carried out. Planning and height precision indicators (HDOP, VDOP, PDOP, TDOP) are detailed. The graphs of coordinates change depending on several cycles of GNSS measurements are also given. It is recommended that you perform repeated GNSS measurements at different points of the year, with long intervals at established checkpoints.

Zenodo (CERN European Organization for Nuclear Research)
Sustainable cities and communities
Openalex Percentile: Top 60%
Geodetic Measurements and Engineering Structures
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

STUDY OF THE METHODOLOGICAL BASIS OF OPTIMIZATION OF THE GEODESIC NETWORK IN THE TERRITORY OF THE MURUNTOV QUARRY INDUSTRIAL ZONE · Zenodo (CERN European Organization for Nuclear Research) (2024) | TGRS Research Map | TGRS