Safety Risk Analysis in Mega Projects: A Case Study

Abstract: The construction industry's technology is evolving at a rapid pace around the globe. Nowadays, the construction sector in India is mostly focused on mega projects. Mega projects are distinct, exceptional, and unique in the building business. These megaprojects are expensive, perhaps exceeding $1 billion USD, have a complex structure, and present additional obstacles. According to some analysts, the minimal cost of a megaproject equals 0.01% of the country's GDP. Mega projects are rapidly expanding in India, with distinct building technologies, techniques, processes, and architectural elements. These megaprojects contribute to the country's development, improve living conditions, and so on. Because of the increased complexity and length of time required to complete construction activities, this type of project introduces a variety of hazards at various phases of development. This may result in a change in the scope of the project, a delay in the project, or even termination of the project. Losses may also arise. Among these dangers, the most critical type is on-site safety risk, which should be treated as a major issue. If this on-site safety risk is ignored, both the project contractor and the client will suffer significant losses. Neglecting safety factors may result in fatalities, faulty construction, project delays, and an increase in project costs. It may potentially result in the discontinuation of the project. So, on-site safety should be prioritised and considered the most crucial component in building. Due to these circumstances, a safety risk assessment should be conducted. This study examines various forms of dangers that may arise during project building on-site. It splits the sorts of risks into two categories based on the type of construction. This analysis is conducted utilising three distinct methodologies. Each risk is assessed and quantified independently, and ranks are assigned based on severity, probability, and effect level. Keywords: Megaproject, Risk Assessment, Technologies, Project Complexity, Probability, Impact Level

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2024-08-15
DOI
https://doi.org/10.5281/zenodo.14169956
Primary Topic
Motor Control and Adaptation
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Safety Risk Analysis in Mega Projects: A Case Study

Zenodo (CERN European Organization for Nuclear Research)
Motor Control and Adaptation
article

Safety Risk Analysis in Mega Projects: A Case Study

article en

Abstract

Abstract: The construction industry's technology is evolving at a rapid pace around the globe. Nowadays, the construction sector in India is mostly focused on mega projects. Mega projects are distinct, exceptional, and unique in the building business. These megaprojects are expensive, perhaps exceeding $1 billion USD, have a complex structure, and present additional obstacles. According to some analysts, the minimal cost of a megaproject equals 0.01% of the country's GDP. Mega projects are rapidly expanding in India, with distinct building technologies, techniques, processes, and architectural elements. These megaprojects contribute to the country's development, improve living conditions, and so on. Because of the increased complexity and length of time required to complete construction activities, this type of project introduces a variety of hazards at various phases of development. This may result in a change in the scope of the project, a delay in the project, or even termination of the project. Losses may also arise. Among these dangers, the most critical type is on-site safety risk, which should be treated as a major issue. If this on-site safety risk is ignored, both the project contractor and the client will suffer significant losses. Neglecting safety factors may result in fatalities, faulty construction, project delays, and an increase in project costs. It may potentially result in the discontinuation of the project. So, on-site safety should be prioritised and considered the most crucial component in building. Due to these circumstances, a safety risk assessment should be conducted. This study examines various forms of dangers that may arise during project building on-site. It splits the sorts of risks into two categories based on the type of construction. This analysis is conducted utilising three distinct methodologies. Each risk is assessed and quantified independently, and ranks are assigned based on severity, probability, and effect level. Keywords: Megaproject, Risk Assessment, Technologies, Project Complexity, Probability, Impact Level

Zenodo (CERN European Organization for Nuclear Research)
National Institute of Construction Management and Research (IN)
Decent work and economic growth
Openalex Percentile: Top 60%
Motor Control and Adaptation
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Safety Risk Analysis in Mega Projects: A Case Study · Zenodo (CERN European Organization for Nuclear Research) (2024) | TGRS Research Map | TGRS