IDENTIFICATION OF PROBLEMS IN IMPLEMENTING SMART CRITERIA IN LOCAL BUDGETING SYSTEM

Abstract The budgeting system of local governments in Indonesia has referred to the Key Performance Indicators (KPI) of SMART (Specific, Measurable, Achievable, Relevant, and Timebound) criteria with a review of the suitability of goals and objectives. The purpose of this study is to identify problems during the adoption of the SMART Criteria KPI into the budgeting system. This study uses a descriptive qualitative method to answer several questions, namely: Has the Government implemented a specific budgeting plan? (Q.1); Has the government planned budgeting in a measured manner? (Q.2); Has the government used the budget fairly and achieved the targets written in the budget system? (Q3); Is the budget system planning relevant to its implementation? (Q4); Has the government done it in a timely manner? (Q.5). The results of the implementation of the SMART Criteria KPI were 68%, categorized as good but not perfect. The conclusion drawn is that this is because the budget system has not optimally integrated cost standards and minimum service standards in fund allocation.

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2024-08-20
DOI
https://doi.org/10.5281/zenodo.13348443
Primary Topic
Aquaculture disease management and microbiota
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

IDENTIFICATION OF PROBLEMS IN IMPLEMENTING SMART CRITERIA IN LOCAL BUDGETING SYSTEM

Zenodo (CERN European Organization for Nuclear Research)
Aquaculture disease management and microbiota
article

IDENTIFICATION OF PROBLEMS IN IMPLEMENTING SMART CRITERIA IN LOCAL BUDGETING SYSTEM

article en

Abstract

Abstract The budgeting system of local governments in Indonesia has referred to the Key Performance Indicators (KPI) of SMART (Specific, Measurable, Achievable, Relevant, and Timebound) criteria with a review of the suitability of goals and objectives. The purpose of this study is to identify problems during the adoption of the SMART Criteria KPI into the budgeting system. This study uses a descriptive qualitative method to answer several questions, namely: Has the Government implemented a specific budgeting plan? (Q.1); Has the government planned budgeting in a measured manner? (Q.2); Has the government used the budget fairly and achieved the targets written in the budget system? (Q3); Is the budget system planning relevant to its implementation? (Q4); Has the government done it in a timely manner? (Q.5). The results of the implementation of the SMART Criteria KPI were 68%, categorized as good but not perfect. The conclusion drawn is that this is because the budget system has not optimally integrated cost standards and minimum service standards in fund allocation.

Zenodo (CERN European Organization for Nuclear Research)
Technical University of Malaysia Malacca (MY), Universiti Teknologi MARA (MY)
Partnerships for the goals
Openalex Percentile: Top 57%
Aquaculture disease management and microbiota
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

IDENTIFICATION OF PROBLEMS IN IMPLEMENTING SMART CRITERIA IN LOCAL BUDGETING SYSTEM · Zenodo (CERN European Organization for Nuclear Research) (2024) | TGRS Research Map | TGRS