III.13 — CERN LIU project: beam dynamics aspects and solutions

The goal of the LHC Injectors Upgrade (LIU) project was to increase the intensity and brightness in the LHC injectors in order to match the challenging requirements of the High-Luminosity LHC (HL-LHC) project, while ensuring high availability and reliable operation of the injectors complex throughout the whole HL-LHC era. Fulfilling this goal required identifying the main performance limitations across all LHC injectors (Linac2, the Proton Synchrotron Booster (PSB), the Proton Synchrotron (PS), the Super Proton Synchrotron (SPS)) and then implementing a combination of extensive hardware modifications and new beam dynamics solutions in order to overcome them. The beam dynamics solutions were studied, tested and, where possible, implemented operationally already during the LHC Run 2 (2014–2018). The great majority of the LIU hardware modifications were implemented during the 2019–2020 CERN accelerators shutdown. This chapter describes the rationale behind the main baseline choices of the LIU project and the evolution of the various project phases, before concluding on the expected beam parameter reach and actual commissioning. It will solely address the upgrade of the proton injector chain, which better matches the pedagogical scope of this contribution.

Publication Details

Journal
CERN Yellow Reports: School Proceedings
Published
2024-11-19
DOI
https://doi.org/10.23730/cyrsp-2024-003.2141
Primary Topic
Vibrio bacteria research studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

III.13 — CERN LIU project: beam dynamics aspects and solutions

CERN Yellow Reports: School Proceedings
Vibrio bacteria research studies
article

III.13 — CERN LIU project: beam dynamics aspects and solutions

article en

Abstract

The goal of the LHC Injectors Upgrade (LIU) project was to increase the intensity and brightness in the LHC injectors in order to match the challenging requirements of the High-Luminosity LHC (HL-LHC) project, while ensuring high availability and reliable operation of the injectors complex throughout the whole HL-LHC era. Fulfilling this goal required identifying the main performance limitations across all LHC injectors (Linac2, the Proton Synchrotron Booster (PSB), the Proton Synchrotron (PS), the Super Proton Synchrotron (SPS)) and then implementing a combination of extensive hardware modifications and new beam dynamics solutions in order to overcome them. The beam dynamics solutions were studied, tested and, where possible, implemented operationally already during the LHC Run 2 (2014–2018). The great majority of the LIU hardware modifications were implemented during the 2019–2020 CERN accelerators shutdown. This chapter describes the rationale behind the main baseline choices of the LIU project and the evolution of the various project phases, before concluding on the expected beam parameter reach and actual commissioning. It will solely address the upgrade of the proton injector chain, which better matches the pedagogical scope of this contribution.

CERN Yellow Reports: School Proceedings
Openalex Percentile: Top 69%
Vibrio bacteria research studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

III.13 — CERN LIU project: beam dynamics aspects and solutions · CERN Yellow Reports: School Proceedings (2024) | TGRS Research Map | TGRS