The Experience of Designing and Building a Floating Intake System in the Doosti Dam

Ensuring water in critical conditions, especially in the hot months of the year, is very critical and requires optimal use of all water capacities. In this research, the study and implementation approach of constructing a floating pumping station in the Doosti dam to water withdrawal from the surface of the reservoir to improve the qualitative and quantitative conditions in water withdrawal from the reservoir of this dam in summer 2023 has been discussed. By using a floating pumping station with an approximate weight of 100 tons, it was possible to supply water with a capacity of 2.25 to 3 m3/s from the Doosti dam reservoir and with a turbidity between 4 and 5 NTU; While without using this floating pumping station, maximum of 2 m3/s of water with a turbidity between 17 and 19 NTU could be extracted from the dam. One of the most important features of this project was the transfer of a significant volume of water from the dam reservoir to the intake tower in the shortest possible time with the least equipment and facilities, which, by being placed in the circuit, was able to play an important role in providing drinking water to the Mashhad city in summer 2023. The results of this research can be used in other dams of the country and in water resources development planning to cover current needs or increase the water quality in the exploitation of dams.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2024-09-01
DOI
https://doi.org/10.22067/jwsd.2024.85917.1292
Primary Topic
Microbial Natural Products and Biosynthesis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Experience of Designing and Building a Floating Intake System in the Doosti Dam

SHILAP Revista de lepidopterología
Microbial Natural Products and Biosynthesis
article

The Experience of Designing and Building a Floating Intake System in the Doosti Dam

article en

Abstract

Ensuring water in critical conditions, especially in the hot months of the year, is very critical and requires optimal use of all water capacities. In this research, the study and implementation approach of constructing a floating pumping station in the Doosti dam to water withdrawal from the surface of the reservoir to improve the qualitative and quantitative conditions in water withdrawal from the reservoir of this dam in summer 2023 has been discussed. By using a floating pumping station with an approximate weight of 100 tons, it was possible to supply water with a capacity of 2.25 to 3 m3/s from the Doosti dam reservoir and with a turbidity between 4 and 5 NTU; While without using this floating pumping station, maximum of 2 m3/s of water with a turbidity between 17 and 19 NTU could be extracted from the dam. One of the most important features of this project was the transfer of a significant volume of water from the dam reservoir to the intake tower in the shortest possible time with the least equipment and facilities, which, by being placed in the circuit, was able to play an important role in providing drinking water to the Mashhad city in summer 2023. The results of this research can be used in other dams of the country and in water resources development planning to cover current needs or increase the water quality in the exploitation of dams.

SHILAP Revista de lepidopterología
Soil Conservation and Watershed Management Research (IR), University of Gonabad (IR)
Openalex Percentile: Top 64%
Microbial Natural Products and Biosynthesis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

The Experience of Designing and Building a Floating Intake System in the Doosti Dam · SHILAP Revista de lepidopterología (2024) | TGRS Research Map | TGRS