Design and implementation of three-phase self-boosting voltage and current integrated standard device

Existing three-phase combined transformer metrological performance verification test exists in the number of required equipments, test wiring complexity, low efficiency and other issues, this paper analyzes the leakage of current and the mutual influence of the various components through the construction of the system electromagnetic perturbation on the integration of the standard characteristics of the impact of the equivalent model, and puts forward the design of the self-boosting high-voltage current standard transformer with shielding and the optimization of the structural layout of the active shielding technology, the development of the highly integrated three-phase self-boosting voltage and self-boosting current standard device for 35 kV and below has realized the integration of three-phase combined transformer standard device, easy wiring, high efficiency of work, which greatly improves the test efficiency and safety, lays a foundation for the optimization of the subsequent three-phase combined transformer calibration device, and provides a powerful technical support for the safe, accurate and efficient full performance testing of power transformers in distribution network.

Institutions

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2025-04-01
DOI
https://doi.org/10.19753/j.issn1001-1390.2025.04.023
Primary Topic
Remote Sensing in Agriculture
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Design and implementation of three-phase self-boosting voltage and current integrated standard device

SHILAP Revista de lepidopterología
Remote Sensing in Agriculture
article

Design and implementation of three-phase self-boosting voltage and current integrated standard device

article en

Abstract

Existing three-phase combined transformer metrological performance verification test exists in the number of required equipments, test wiring complexity, low efficiency and other issues, this paper analyzes the leakage of current and the mutual influence of the various components through the construction of the system electromagnetic perturbation on the integration of the standard characteristics of the impact of the equivalent model, and puts forward the design of the self-boosting high-voltage current standard transformer with shielding and the optimization of the structural layout of the active shielding technology, the development of the highly integrated three-phase self-boosting voltage and self-boosting current standard device for 35 kV and below has realized the integration of three-phase combined transformer standard device, easy wiring, high efficiency of work, which greatly improves the test efficiency and safety, lays a foundation for the optimization of the subsequent three-phase combined transformer calibration device, and provides a powerful technical support for the safe, accurate and efficient full performance testing of power transformers in distribution network.

SHILAP Revista de lepidopterología
Inner Mongolia Electric Power (China) (CN), Zhejiang University (CN)
Affordable and clean energy
Openalex Percentile: Top 55%
Remote Sensing in Agriculture
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Design and implementation of three-phase self-boosting voltage and current integrated standard device · SHILAP Revista de lepidopterología (2025) | TGRS Research Map | TGRS