An expansion and reconstruction project case for the leachate treatment station in Handan

Due to the rapid increase of landfill volume and the aging and damage of the leachate treatment facilities at a landfill in Handan, the original leachate treatment station at the landfill could not meet the existing leachate treatment needs. The combined process of “pretreatment+external MBR+nanofiltration(NF)+reverse osmosis(RO)” was adopted to expand and reconstruct the original leachate treatment station,and a new nanofiltration concentration reduction system was built. The “material membrane reduction+humic acid extraction” process was adopted to achieve concentration reduction treatment. The problems of tight schedules, compact sites, and shortage of funds were effectively solved through rational layout, reconstruction of old buildings, and construction of new steel tanks. After the expansion and reconstruction, the treatment capacity of the leachate treatment station was 500 m³/d with the yield of effluent clear liquid as 95%. The effluent water quality stably met the emission standard of Table 2 in the “Standard for Pollution Control on the Landfill Site of Municipal Solid Waste”(GB 16889‒2008). The total investment for the project was 22.18 million yuan, and the actual operating cost of the renovated leachate treatment station was 41.82 yuan/m3.

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2024-12-01
DOI
https://doi.org/10.19965/j.cnki.iwt.2024-0216
Primary Topic
Aquatic Ecosystems and Phytoplankton Dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An expansion and reconstruction project case for the leachate treatment station in Handan

SHILAP Revista de lepidopterología
Aquatic Ecosystems and Phytoplankton Dynamics
article

An expansion and reconstruction project case for the leachate treatment station in Handan

article en

Abstract

Due to the rapid increase of landfill volume and the aging and damage of the leachate treatment facilities at a landfill in Handan, the original leachate treatment station at the landfill could not meet the existing leachate treatment needs. The combined process of “pretreatment+external MBR+nanofiltration(NF)+reverse osmosis(RO)” was adopted to expand and reconstruct the original leachate treatment station,and a new nanofiltration concentration reduction system was built. The “material membrane reduction+humic acid extraction” process was adopted to achieve concentration reduction treatment. The problems of tight schedules, compact sites, and shortage of funds were effectively solved through rational layout, reconstruction of old buildings, and construction of new steel tanks. After the expansion and reconstruction, the treatment capacity of the leachate treatment station was 500 m³/d with the yield of effluent clear liquid as 95%. The effluent water quality stably met the emission standard of Table 2 in the “Standard for Pollution Control on the Landfill Site of Municipal Solid Waste”(GB 16889‒2008). The total investment for the project was 22.18 million yuan, and the actual operating cost of the renovated leachate treatment station was 41.82 yuan/m3.

SHILAP Revista de lepidopterología
Openalex Percentile: Top 68%
Aquatic Ecosystems and Phytoplankton Dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

An expansion and reconstruction project case for the leachate treatment station in Handan · SHILAP Revista de lepidopterología (2024) | TGRS Research Map | TGRS