First two years of FRIB operation

The Facility for Rare Isotope Beams (FRIB), a major nuclear physics facility for research with fast, stopped, and reaccelerated rare isotope beams, was successfully commissioned and has been in operation for the past two years. Various ion beam species have been accelerated up to 300 MeV/u and delivered to the target. FRIB routinely provided 10 kW primary beams on target over the past year, a factor of 10 above used at the beginning of user operation. Recently, a record-high 10.4 kW of uranium beam, the most challenging for accelerator systems, was delivered to the target, and three new isotopes were discovered during a short 24-hour run. In July 2024, we plan to develop a 20-kW Se-82 beam and provide it for the first observation of neutron-rich rare isotopes of calcium. Every incremental step in energy and power of primary beams allows us to gain valuable experience in the facility's safe operation and provides directions for further improvements. Several accelerator improvement projects are being pursued for further power ramp-up, improving the accelerator availability, delivering more time for science, and preparing for the ultimate 400 kW beam on target. This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics and used resources of the FRIB Operations, which is a DOE Office of Science User Facility under Award Number DE-SC0023633.

Institutions

Publication Details

Journal
JACOW
Published
2024-10-25
DOI
https://doi.org/10.18429/jacow-linac2024-tuxa004
Citations
1
Primary Topic
Prenatal Screening and Diagnostics
Type
article
Field-Weighted Citation Impact
1.11
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

First two years of FRIB operation

1 citations
JACOW
Prenatal Screening and Diagnostics
1.11
article

First two years of FRIB operation

article en
1 citations

Abstract

The Facility for Rare Isotope Beams (FRIB), a major nuclear physics facility for research with fast, stopped, and reaccelerated rare isotope beams, was successfully commissioned and has been in operation for the past two years. Various ion beam species have been accelerated up to 300 MeV/u and delivered to the target. FRIB routinely provided 10 kW primary beams on target over the past year, a factor of 10 above used at the beginning of user operation. Recently, a record-high 10.4 kW of uranium beam, the most challenging for accelerator systems, was delivered to the target, and three new isotopes were discovered during a short 24-hour run. In July 2024, we plan to develop a 20-kW Se-82 beam and provide it for the first observation of neutron-rich rare isotopes of calcium. Every incremental step in energy and power of primary beams allows us to gain valuable experience in the facility's safe operation and provides directions for further improvements. Several accelerator improvement projects are being pursued for further power ramp-up, improving the accelerator availability, delivering more time for science, and preparing for the ultimate 400 kW beam on target. This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics and used resources of the FRIB Operations, which is a DOE Office of Science User Facility under Award Number DE-SC0023633.

JACOW
Michigan State University (US)
Openalex Percentile: Top 14%
Prenatal Screening and Diagnostics
1.11
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.