Conversion Scheme Design of Power Supply Return Mode for Metro Connection Lines

Objective The metro lines connected by connection line may adopt different power supply current return modes. In order to improve the efficiency of train line transfer, it is necessary to set up the return mode conversion section within the connection line and design the return mode conversion scheme, which shall meet the demand of using the running rail and the return rail to return current. Method With Shaoxing Metro Line 1 (hereinafter referred to as "Line 1") and the first phase project of Shaoxing Metro Line 2 (hereinafter referred to as "Line 2") as examples, the overview of the two lines and details of the connection line are introduced. From the aspects of operation conditions, economy and engineering feasibility, three design schemes (Scheme 1, Scheme 2 and Scheme 3) for the power supply return mode conversion within the connection line are proposed, and their advantages and disadvantages are analyzed respectively. Result & Conclusion Scheme 3 is recommended. It can not only effectively solve the problem of train power loss, reduce the possibility of generating electrical conduction and foreign current between the two lines, but also optimize the train line transfer process and improve the efficiency.

Publication Details

Journal
SHILAP Revista de lepidopterología
Published
2024-09-01
DOI
https://doi.org/10.16037/j.1007-869x.2024.09.031
Primary Topic
Engineering and Material Science Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Conversion Scheme Design of Power Supply Return Mode for Metro Connection Lines

SHILAP Revista de lepidopterología
Engineering and Material Science Research
article

Conversion Scheme Design of Power Supply Return Mode for Metro Connection Lines

article en

Abstract

Objective The metro lines connected by connection line may adopt different power supply current return modes. In order to improve the efficiency of train line transfer, it is necessary to set up the return mode conversion section within the connection line and design the return mode conversion scheme, which shall meet the demand of using the running rail and the return rail to return current. Method With Shaoxing Metro Line 1 (hereinafter referred to as "Line 1") and the first phase project of Shaoxing Metro Line 2 (hereinafter referred to as "Line 2") as examples, the overview of the two lines and details of the connection line are introduced. From the aspects of operation conditions, economy and engineering feasibility, three design schemes (Scheme 1, Scheme 2 and Scheme 3) for the power supply return mode conversion within the connection line are proposed, and their advantages and disadvantages are analyzed respectively. Result & Conclusion Scheme 3 is recommended. It can not only effectively solve the problem of train power loss, reduce the possibility of generating electrical conduction and foreign current between the two lines, but also optimize the train line transfer process and improve the efficiency.

SHILAP Revista de lepidopterología
Affordable and clean energy
Openalex Percentile: Top 38%
Engineering and Material Science Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Conversion Scheme Design of Power Supply Return Mode for Metro Connection Lines · SHILAP Revista de lepidopterología (2024) | TGRS Research Map | TGRS